My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2022-064
>
Meetings
>
2022
>
03. March
>
2022-03-01 10:00 AM - Commissioners' Agenda
>
Res-2022-064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 12:25:11 PM
Creation date
4/1/2022 12:25:04 PM
Metadata
Fields
Template:
Meeting
Date
3/1/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
f
Item
Request to Approve a Resolution Authorizing the Chair's Signature on Task Order #11 with Century West for Construction of a New Airport Taxilane
Order
6
Placement
Consent Agenda
Row ID
86539
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Draft Construction Safety and Phasing Plan {CSPP)r Draft FAA Form 7460 (construction and permanent conditionsl <br />TASKT-FlnalDesign <br />7.1 Review intermediate level review comments from the County; address and respond to comments. <br />7,2 Based on FM comments, prepare final CSPP and 7460. Upload the final CSPP and 7460 to the OE/AAA portal <br />7.3 Prepare final plans. 15 plan sheets are anticipated. <br />7 .4 tuepare final project manual of bidding documents and specifications. <br />7.5 Prepare final construction cost estimate. <br />7.6 Compile final submittal package and submit to the County for advertisement of bids. <br />DEI.IVERASLES: <br />r Final plans (PDF) <br />. Final project rnanual of bidding documents (PDF) <br />r Final enganeer's estimate {PDF}r Final Construction Safetyand Phasing Plan (CSPP) <br />r Final FAA Forrn 7460 {construction and pernanent conditions) <br />TASKS-EldServices <br />8.1 Consolidate and upload bidding documents to Quest CDN bid documents website. <br />8.2 Provide an advertisement for the public bidding of the project. The County will send the lnvitatbn to 8id to <br />media outlets for advertisement, and pay advertising fees, <br />8.3 Provide project coordination with the County throughout the bidding period. <br />8.4 Review, research, and prepare answers to technical questions during bidding. <br />8.5 Prepare addenda as necessary to clarifo bid documents. Addenda will be distributed by the Engineer. For <br />scoping purposes this scope assumes two addenda will be prepared. Addenda will be consotidated into one <br />pdf electronic file and uploaded to the Quest CDN website. <br />8,6 Coordinate, attend, and facilitate a pre-bid conference forthe project at the airport. Prepare meeting agenda, <br />sign-in sheet. The Project Manager will attend the pre-bid conference. <br />8.7 The County will facilitate the bid opening and provide the Engineer with copies of all bid packages received. <br />8.8 Prepare bid tabulation and prepare a Bkl Analysis Letter to the Airport for award of bid. lt is assumed the <br />County will issue the Notice of Award letter. <br />5
The URL can be used to link to this page
Your browser does not support the video tag.