My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Task Order 11
>
Meetings
>
2022
>
03. March
>
2022-03-01 10:00 AM - Commissioners' Agenda
>
Task Order 11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2022 12:20:38 PM
Creation date
4/1/2022 12:20:32 PM
Metadata
Fields
Template:
Meeting
Date
3/1/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
f
Item
Request to Approve a Resolution Authorizing the Chair's Signature on Task Order #11 with Century West for Construction of a New Airport Taxilane
Order
6
Placement
Consent Agenda
Row ID
86539
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2 Prepare pavement design identifying the pavement section for the new taxilane. <br />5.3 Prepare a conceptual level cost estamate for each of the alternatives developed in Task 5.1. <br />5,4 Conduct a review meeting with the County to discuss the alternatives and identify the preferred alternative <br />DETIVERABLES: <br />o Plan sheet of each concept level alternative (up to three altematives) <br />. Pavement section design <br />. Construction cost estimate for each alternative (up to three alternatives) <br />TASK 6 - lntermedlate Design <br />Prepare an intermediate level design of the preferred alternative. lntermediate design will include the following: <br />6.1 Finalize horizontal layout of preferred alternative and prepare vertical grade design and transitlons to existing <br />pavement tie.,ins. <br />6.2 Prepare draft Construction Safety and Phasing Plan {CSPP) and draft 7460. 7460 will be prepared for <br />temporary construction impects and the perrnan€nt condition. Upload the CSPP and 7460 to the OE/AM <br />portal for revlew by all FAA offices. <br />6.3 Prepare preliminary construction phasing/safety/work area plan drawings to be incorporated into the <br />construction plans set. <br />6.4 Perform engineerin€ for development of the taxilane paving and grading plans. <br />5.5 Prepare a demolition design to identify and depict items scheduled for removal. <br />6.6 As necessary per County requirements determined in the task 4 County pre-application meeting, prepare a <br />drainage design and draft drainage site plan technical report for the taxilane construction. Drainage design <br />and report will be per Kittitas County requirements. lt is assumed that drainage design is limited to surface <br />runoff to infield grades, and water quality treatment is achieved by filter strips and/or infiltration Eest <br />Management Practices (8MPsl, lt is assumed that stormwater conveyance, flow control, and detention is go! <br />required for this project. <br />lf required by the County the limited Stormwater Site Plan will be prepared for the project improvements <br />based on the requirements of the Oepartment of Ecology Stormwater Management Manual for Eastern <br />Washington. Stormwater design elements may require and are limlted to the following items: <br />al Perform a site analysis using existing documents and reports, and evaluation of existing site conditions. <br />b) Using the findings of the site analysis and guldance of the regulating documents determine the applicable core <br />drainage elements for this project. <br />c) Prepare a preliminary and final design of the permanent stormwater systern BMPs. <br />d) As necessary and determined ar part of task 5.4, prepare a prellminary and final design of a subdrainage <br />system to protect the reconstructed pavement $ection. <br />3
The URL can be used to link to this page
Your browser does not support the video tag.