Laserfiche WebLink
e) Prepare a draft Stormwater Site Plan report and submit to the County for review. Provide draft via email in <br />PDF format. <br />f) Coordinate and address review comments and incorporate changes into draft report. <br />g) Prepare a final Stormwater Site Plan report and submit to the County for approval. Provide report via email <br />in PDF format. <br />6,7 Prepare a pavement marking design for the taxilane. <br />6.8 Prepare typical sections, paving details, and miscellaneous details required for construction. <br />6.9 Prepare a preliminary erosion control plan and details. Erosion and sediment control plan will meet <br />Washington Department of tcology guidelines. <br />6.10 Prepare intermediate ptans for the taxilane constructaon. 16 plan sheets are anticipated; these include: <br />. Cover Sheet {1). Slte Survey & Control Plan (1) <br />. Construction Safety& Phasing Plan {1}I Construction Safety& Phasing Notes and Oetaals {1)r Oemolition Plan (1) <br />. Erosion Control Plan {1)r Erosion Control Notes & Details (1) <br />e Taxllane Plan/Profile {2). Typical Pav€ment Sections {1fr Grading Sections 12)r MarkinB Plan & Marking Details (1) <br />. Stormwater & Subdraina8e Site Plan & Details (2) <br />r Pavement Marking Plan & Details (1) <br />6.11 Prepare intermediate level project rnanual of bidding documents and specifications. <br />Bidding docurnents will include bidding/contract specifications, general and special provisions, technlcal <br />provisions, and other related sections and forms, <br />Specifications will be developed using Advbory Circula r 150/5370 10 {latest edition), Standards for <br />Specifying Construction of Airports and any bollerplate front end specifications provided by the County. <br />6.12 Prepare intermediate level enginee/s estimate for the cost of construction <br />6.13 Compile intermediate level submittal package and submit to the Counly for review electronically. <br />6.14 Conduct in.house aA/QC review of intermediate level submittal documents. <br />6,15 Consultant will lead an intermediate review meeting (via phone or web conference) with the County to <br />review the intermedlate design * plans, specificalions, and projest cost. <br />DE[IVERA8I.ES: <br />r lntermediate level plans (PDF) <br />r lntermediate level project manual of bidding documents {PDF)r lntermediate level engineer's egtimate {PDF} <br />a <br />a <br />4