My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TO11 2022 Hangar Taxilane Development_scope_r2
>
Meetings
>
2022
>
03. March
>
2022-03-01 10:00 AM - Commissioners' Agenda
>
TO11 2022 Hangar Taxilane Development_scope_r2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 2:15:49 PM
Creation date
2/24/2022 2:15:19 PM
Metadata
Fields
Template:
Meeting
Date
3/1/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
f
Item
Request to Approve a Resolution Authorizing the Chair's Signature on Task Order #11 with Century West for Construction of a New Airport Taxilane
Order
6
Placement
Consent Agenda
Row ID
86539
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />4 <br /> <br />e) Prepare a draft Stormwater Site Plan report and submit to the County for review. Provide draft via email in <br />PDF format. <br /> <br />f) Coordinate and address review comments and incorporate changes into draft report. <br /> <br />g) Prepare a final Stormwater Site Plan report and submit to the County for approval. Provide report via email <br />in PDF format. <br /> <br />6.7 Prepare a pavement marking design for the taxilane. <br />6.8 Prepare typical sections, paving details, and miscellaneous details required for construction. <br />6.9 Prepare a preliminary erosion control plan and details. Erosion and sediment control plan will meet <br />Washington Department of Ecology guidelines. <br />6.10 Prepare intermediate plans for the taxilane construction. 16 plan sheets are anticipated; these include: <br />• Cover Sheet (1) <br />• Site Survey & Control Plan (1) <br />• Construction Safety & Phasing Plan (1) <br />• Construction Safety & Phasing Notes and Details (1) <br />• Demolition Plan (1) <br />• Erosion Control Plan (1) <br />• Erosion Control Notes & Details (1) <br />• Taxilane Plan/Profile (2) <br />• Typical Pavement Sections (1) <br />• Grading Sections (2) <br />• Marking Plan & Marking Details (1) <br />• Stormwater & Subdrainage Site Plan & Details (2) <br />• Pavement Marking Plan & Details (1) <br />6.11 Prepare intermediate level project manual of bidding documents and specifications. <br />• Bidding documents will include bidding/contract specifications, general and special provisions, technical <br />provisions, and other related sections and forms. <br />• Specifications will be developed using Advisory Circular 150/5370-10 (latest edition), Standards for <br />Specifying Construction of Airports and any boilerplate front end specifications provided by the County. <br />6.12 Prepare intermediate level engineer’s estimate for the cost of construction. <br />6.13 Compile intermediate level submittal package and submit to the County for review electronically. <br />6.14 Conduct in-house QA/QC review of intermediate level submittal documents. <br />6.15 Consultant will lead an intermediate review meeting (via phone or web conference) with the County to <br />review the intermediate design – plans, specifications, and project cost. <br />DELIVERABLES: <br />• Intermediate level plans (PDF) <br />• Intermediate level project manual of bidding documents (PDF) <br />• Intermediate level engineer’s estimate (PDF)
The URL can be used to link to this page
Your browser does not support the video tag.