My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TO11 2022 Hangar Taxilane Development_scope_r2
>
Meetings
>
2022
>
03. March
>
2022-03-01 10:00 AM - Commissioners' Agenda
>
TO11 2022 Hangar Taxilane Development_scope_r2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 2:15:49 PM
Creation date
2/24/2022 2:15:19 PM
Metadata
Fields
Template:
Meeting
Date
3/1/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
f
Item
Request to Approve a Resolution Authorizing the Chair's Signature on Task Order #11 with Century West for Construction of a New Airport Taxilane
Order
6
Placement
Consent Agenda
Row ID
86539
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5 <br /> <br />• Draft Construction Safety and Phasing Plan (CSPP) <br />• Draft FAA Form 7460 (construction and permanent conditions) <br /> <br />TASK 7 – Final Design <br />7.1 Review intermediate level review comments from the County; address and respond to comments. <br />7.2 Based on FAA comments, prepare final CSPP and 7460. Upload the final CSPP and 7460 to the OE/AAA portal. <br />7.3 Prepare final plans. 16 plan sheets are anticipated. <br />7.4 Prepare final project manual of bidding documents and specifications. <br />7.5 Prepare final construction cost estimate. <br />7.6 Compile final submittal package and submit to the County for advertisement of bids. <br />DELIVERABLES: <br />• Final plans (PDF) <br />• Final project manual of bidding documents (PDF) <br />• Final engineer’s estimate (PDF) <br />• Final Construction Safety and Phasing Plan (CSPP) <br />• Final FAA Form 7460 (construction and permanent conditions) <br /> <br />TASK 8 – Bid Services <br />8.1 Consolidate and upload bidding documents to Quest CDN bid documents website. <br />8.2 Provide an advertisement for the public bidding of the project. The County will send the Invitation to Bid to <br />media outlets for advertisement, and pay advertising fees. <br />8.3 Provide project coordination with the County throughout the bidding period. <br />8.4 Review, research, and prepare answers to technical questions during bidding. <br />8.5 Prepare addenda as necessary to clarify bid documents. Addenda will be distributed by the Engineer. For <br />scoping purposes this scope assumes two addenda will be prepared. Addenda will be consolidated into one <br />pdf electronic file and uploaded to the Quest CDN website. <br />8.6 Coordinate, attend, and facilitate a pre-bid conference for the project at the airport. Prepare meeting agenda, <br />sign-in sheet. The Project Manager will attend the pre-bid conference. <br />8.7 The County will facilitate the bid opening and provide the Engineer with copies of all bid packages received. <br />8.8 Prepare bid tabulation and prepare a Bid Analysis Letter to the Airport for award of bid. It is assumed the <br />County will issue the Notice of Award letter.
The URL can be used to link to this page
Your browser does not support the video tag.