My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ConCon Amendment 1 SOWs
>
Meetings
>
2022
>
02. February
>
2022-02-15 10:00 AM - Commissioners' Agenda
>
ConCon Amendment 1 SOWs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 1:06:04 PM
Creation date
2/10/2022 1:01:02 PM
Metadata
Fields
Template:
Meeting
Date
2/15/2022
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
g
Item
Request to Approve and Authorize Signature of the Public Health Director on the Consolidated Contract Amendment 1 between the Department of Health and the Kittitas County Public Health Department
Order
7
Placement
Consent Agenda
Row ID
86034
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Contractor is responsible to ensure that allterms, conditions, assurances, and certifications set forth in this Contract are included in the subcontract, including all <br />confidentiality and data security requirements. <br />• All contract terms in the above -referenced contract remain in full force and effect and nothing in this Checklist shall be construed as waiver of terms in the above - <br />referenced Contract. <br />Contract Noncompliance and Corrective Action (see CFR § 200.338 Remedies for noncompliance) <br />The Subrecipient must meet the required set of acceptable deliverables/outcomes and adhere to contractual obligations. The co ntract's acceptable deliverables/outcomes alongwith <br />specified due dates will be determined by the DOH SNAP -Ed program and provided to the Subrecipient in writing. Based on contract performance (as documented in progress <br />reviews, progress reports, project monitoring reports, and fiscal monitoring reports) and after implementation of otherspecific conditions as appropriate listed in CFR § 200.207 - <br />Specific conditions (see htti2s://www.iovreizs.com/regulations/2/20Q..207), DOH reserves the right to withhold up to 10% of funds from the next applicable payment to the <br />Subrecipient for deliverables/outcomes that are documented as consistently incomplete; continually late (without approved extension by D OH in writing); found to be unacceptable <br />or unsatisfactory accordingto the standards of acceptable deliverables/outcomes outlined in the Statement of Work; or, not carred out sufficiently or consistently and documented <br />as such. After DOH SNAP -Ed provides documentation of the issue(s) and outlines the appropriate corrective action in writing, and with approval from t he DOH SNAP -Ed <br />program manager, the first withholding of funds up to 10% would occur one time and allow 60 days forthe appropriate corrective action to be completed by the Subrecipient. If <br />satisfactory corrective action is completed within 60 days, the funds withheld will be released to the Subrecipient. If satisfactory corrective action does not take place within 60 <br />days, up to 5% of funds will be withheld from each subsequent monthly payment untilthe appropriate corrective action is comp leted.If satisfactory corrective action is completed <br />after the 60 -day window, the initial 10%of fundswithheld will notbeprovided as reimbursement to the Subrecipient aspenalty.The subsequent monthly withholdings (ofup to <br />5% per month) will be reimbursed to the Subrecipient upon satisfactory completion of the corrective action. The Subrecipient may request reconsideration by submitting a letter to <br />Washington Department of Health SNAP -Education, PO Box 47886, Olympia, WA 98504-7886, orin writing via email to snap-ed(&doh.wa.gov. <br />All invoices must be approved by DOH prior to payment; approval will not be unreasonably withheld. DOH will authorize payment only upon satisfactory and on-time completion <br />of acceptance deliverables/outcomes and for allowable costs as outlined in the SNAP -Ed federa I guidance, statement of work, state plan, and/or budget. DOH will return all <br />incorrect or incomplete invoices and will not pay for services that occur outside the period of performance orthat are deemed unallowable costs. <br />Additional Details Regarding Deliverables <br />Required deliverables for SNAP -Ed reporting will depend on approved SNAP -Ed plan activities for each Subrecipient, e.g. if direct education is not an approved plan activity fora <br />Subrecipient, submission of pre/post surveys is not a required deliverable forthat Subrecipient. To attend required trainings during fiscal year, the Subrecipient must use the travel <br />funds within their current allotted budget to send the minimum numberof one (1) staff person to the required training. The Subrecipient may request additional travel funds from <br />DOH for required training(s) if necessary and if funds are available. <br />Monitoring Expectations <br />The Subrecipient's premises and records will be made available upon request to DOH, DSHS, and USDA staff forthe purposes of observing project activities and reviewing for <br />project and fiscal compliance. All non -capital equipment, capital equipment, reusable educationalmaterialsandsupplies,andanynon-disposable items purchased using SNAP -Ed <br />funds should be tracked in an inventorylist and available forreview upon request. Based on fiscal and project monitoring results or findings, a dditiona I monitoring during the <br />fiscal year maybe required at the discretion of the DOH SNAP -Ed program, DOH fiscal analyst, or DOH fiscal monitoring unit. Completed project and fisca I monitoring reports <br />with suggestions, observations, comments, feedback, findings, and/or corrective action will be kept on file at DOH and shared with Subrecipients regularly and by request. <br />Staff Requirements <br />Upon request by DOH, the Subrecipient must demonstrate that SNAP -Ed staff meet requirements appropriate to their positions including but not limited to: background checks, <br />food handlers' permits, qualifications, and training required by DOH. <br />Project Coordinator Requirements <br />The Subrecipient must maintain a SNAP -Ed project coordinator. The project coordinator is the main contact between Department of Health SNAP -Ed team and the Subrecipient. <br />DOH SNAP -Ed expectations forthe project coordinator responsibilities include: <br />Exhibit A, Statement of Work Page 9 of 12 Contract NumberCLH31015 <br />Template September2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.