My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2021-173
>
Meetings
>
2021
>
11. November
>
2021-11-16 10:00 AM - Commissioners' Agenda
>
Res-2021-173
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2021 11:21:23 AM
Creation date
11/22/2021 11:20:35 AM
Metadata
Fields
Template:
Meeting
Date
11/16/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
a
Item
Request to Approve a Resolution for the Meadows Development Agreement Resolution (DV-19-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
83269
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit F - phasing and Timelines <br />Phas e One <br />R v comptex - Time: Platting and construction will be impacted by discussions with Eastonwater District #3 (see Exhibit D)' Expectations are for construction to cornmence within 24 monthsof the water iine roop bei'g approv"d ana rereased to flre District,r construction build out would be slated for upward of 20 years and subject to the termsof this agreement. <br />r with the commencement of construction for the water storage upgrade, the first phaseof construction will be focused toward the water Iine loop and connection of E sparksRoad with Country Drive, <br />F The west side of Meadow way will be targeted for construction l.rwithfencing and vertical construction. <br />" .""T:.T^:lr-on <br />wi]t coltinue moving easr. Estimated timing would likely be amuous consfuction cycre over each summer for the i"*ii",oro ,"".*dependent on marketing conditions, etc. and include the improvements anddevelopment of the private campground and R V park.F As the market develops arorld the RV storage presence, the service shop andretail support facilify will be built; expectutrJr* u. for this to happen as 50yoofthe storage units are sold.F Estimated compretion of storage comprex is by the end of 203g. <br />Phase 2 -6-In nos c order rovided itm with KCC.p eetsWith the construction of Meadow Way north to a cul-de-sac just south of the BPA distributionlines, added water storage and the required looping of the Easton Water Districts East SparksRoad distribution line in place, residenfial development ancl fufure phasing could conceivablyhappenindependent ofeach other or additional infraskucture needs. The looped water lines willinclude tees and valves allowing for water line spurs to be added as needed. We request thatonce Easton Water Districts current water infrastructure needs are in place, platting andconstruction of added lots and townhomes can be added by the land owner and subject toconcurrence with the Kiftitas County CDS Director <br />Residential Single-Family Homes -As Agreed with CDS DirectorF As noted above,with the looped water system inclusive of tees with valves,differing sections of the development can be independent ofeachdevelopedotherExpectations are for adding g to 16 homes on to the system annually andper market demand <br />Town Homes - construction start within 10 years from water tank compretion <br />a <br />Page 2 of3