My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2021-173
>
Meetings
>
2021
>
11. November
>
2021-11-16 10:00 AM - Commissioners' Agenda
>
Res-2021-173
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2021 11:21:23 AM
Creation date
11/22/2021 11:20:35 AM
Metadata
Fields
Template:
Meeting
Date
11/16/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
a
Item
Request to Approve a Resolution for the Meadows Development Agreement Resolution (DV-19-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
83269
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit F -phasing and Timelines <br />Marian Meadows <br />Phasing-Timelines <br />within the approved puD apprications for-Marian Meadows, a phasing sequence for thedevelopmenr is required. wiri r" *uo, oor*o*o* oirrru;;;;"* the proposed prar wourd beapproved and what elements or aspects would be incruded ;,hio the approvars, we provided ourbest expectations of how tfr" A"u"iop_.ot would proceed. <br />At this point in time and with a much better understanding of erements to be included within theproject' we request the development agreennent be inclusive of following phasi'g sequence. <br />It has become clear that the Easton water system is in need of infrastructure/distribution updatesto maintain seruices levels and this single issue will put the looprng of an g,, water line from Esparks Road through Marian nn"uao*r unJ <br />"orro..t*d to the distribution linc on the north end ofcountry Drive as a priority' with this io *ioo, we submit ttre rottowing timerine for incrusion ofthe Development Agreement for the plat of Marian Meadows. <br />Looped Water Line _ Time: <br />a # <br />dedication of roadway to Kittitas County as a public Road. <br />to the BPA Distribution lines. This ril u.iru.roped to Kcc private roadstandards and wilr incrude the extensioo oid* power line grid from pugersound Energy and the improvement of said water rine loop incrusive ofdesigned fire hydrant layouts, water system valves for future sub-divisionsconnections and access points for private ,ouJ*u, extensions. <br />E sparks Road and Meadow way interse"riio. ,t"r" lots will be available forsale with final plat recording. <br />water Tank - Time: As negotiated with Easton water District #3.water tank construction will be independent of Marian Meadows developinent and beclosely tied to efforts with the water orstrict. Expectation* u.. fo. this to commence construction <br />ffir':.*t <br />single-family homes <br />'ut', oit ", than the 2 parcels rocated south of the srorage <br />Construction of looped water line will commence under a negotiated agreement withthe Water District. <br />Page I of3
The URL can be used to link to this page
Your browser does not support the video tag.