Laserfiche WebLink
Exhibit F _phasing and Timelines <br />develop as the market dictates. Expectaions are for the type of housing tofollow the singre-family housing *.n rnr**ent with building #1 rikery to bestarted on or belbre 2030 with build out by 2036 <br />erm ented t time ded itmwithKCC. <br />r Large parcel home sites _ <br />D These sites are separate and stand-arono uses from Marian Meadows. whileincruded within the,pIJD, we request that they be viewed and handred by trrecounty as independent large parcet proferties. Due to locafion andcharacteristics unique to drese pur"r, such us access, elevations and location, <br />;: illf: <br />including rhese into th. u"rif and prarting of adjacent property to <br />Page 3 of3