My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DV-19-00001 Marian Meadows Development Agreement
>
Meetings
>
2021
>
11. November
>
2021-11-16 10:00 AM - Commissioners' Agenda
>
DV-19-00001 Marian Meadows Development Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2021 12:40:20 PM
Creation date
11/10/2021 12:37:19 PM
Metadata
Fields
Template:
Meeting
Date
11/16/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Request to Approve a Resolution for the Meadows Development Agreement Resolution (DV-19-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
83269
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit F — Phasing and Timelines <br />Phase One <br />R V Complex - Time: Platting and construction will be impacted by discussions with Easton <br />Water District #3 (See Exhibit D). Expectations are for construction to commence within 24 months <br />of the water line loop being approved and released to the District. <br />• Construction build out would be slated for upward of 20 years and subject to the terms <br />of this agreement. <br />• With the commencement of construction for the water storage upgrade, the first phase <br />of construction will be focused toward the water line loop and connection of E Sparks <br />Road with Country Drive, <br />➢ The west side of Meadow Way will be targeted for construction 1st with <br />fencing and vertical construction. <br />➢ Construction will continue moving east. Estimated timing would likely be a <br />continuous construction cycle over each summer for the next ten to 20 years <br />dependent on marketing conditions, etc. and include the improvements and <br />development of the private campground and R V Park. <br />➢ As the market develops around the RV Storage presence, the service shop and <br />retail support facility will be built; expectations are for this to happen as 50% <br />of the storage units are sold. <br />➢ Estimated completion of Storage complex is by the end of 2038. <br />Phase 2-6 — In no specific order provided.it meets with KCC. <br />With the construction of Meadow Way north to a cul-de-sac just south of the BPA distribution <br />lines, added water storage and the required looping of the Easton Water Districts East Sparks <br />Road distribution line in place, residential development and future phasing could conceivably <br />happen independent of each other or additional infrastructure needs. The looped water lines will <br />include tees and valves allowing for water line spurs to be added as needed. We request that <br />once Easton Water Districts current water infrastructure needs are in place, platting and <br />construction of added lots and townhomes can be added by the land owner and subject to <br />concurrence with the Kittitas County CDS Director. <br />• Residential Single -Family Homes — As Agreed with CDS Director. <br />➢ As noted above, with the looped water system inclusive of tees with valves, <br />differing sections of the development can be developed independent of each <br />other. Expectations are for adding 8 to 16 homes on to the system annually and <br />per market demand. <br />• Town Homes —Construction start within 10 years from water tank completion. <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.