My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DV-19-00001 Marian Meadows Development Agreement
>
Meetings
>
2021
>
11. November
>
2021-11-16 10:00 AM - Commissioners' Agenda
>
DV-19-00001 Marian Meadows Development Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2021 12:40:20 PM
Creation date
11/10/2021 12:37:19 PM
Metadata
Fields
Template:
Meeting
Date
11/16/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Request to Approve a Resolution for the Meadows Development Agreement Resolution (DV-19-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
83269
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit F — Phasing and Timelines <br />Marian Meadows <br />Phasing -Timelines <br />Within the approved PUD applications for Marian Meadows, a phasing sequence for the <br />development is required. With so many unknowns of what or how the proposed plat would be <br />approved and what elements or aspects would be included within the approvals, we provided our <br />best expectations of how the development would proceed. <br />At this point in time and with a much better understanding of elements to be included within the <br />project, we request the development agreement be inclusive of following phasing sequence. <br />It has become clear that the Easton Water System is in need of infrastructure/distribution updates <br />to maintain services levels and this single issue will put the looping of an S" water line from E <br />Sparks Road through Marian Meadows and connected to the distribution line on the north end of <br />Country Drive as a priority. With this in mind, we submit the following timeline for inclusion of <br />the Development Agreement for the Plat of Marian Meadows. <br />Looped Water Line - Time: As negotiated with Easton Water District #3. <br />• Construction of looped water line will commence under a negotiated agreement with <br />the Water District. <br />➢ This will be inclusive of an extension of Meadow Way to the round -a -bout and <br />dedication of roadway to Kittitas County as a Public Road. <br />➢ Further development of the private extension of Meadow Way north as shown <br />to the BPA Distribution lines. This will be developed to KCC private road <br />standards and will include the extension of the power line grid from Puget <br />Sound Energy and the improvement of said water line loop inclusive of <br />designed fire hydrant layouts, water system valves for future sub -divisions <br />connections and access points for private roadway extensions. <br />➢ Included within this time frame will be the platting of the two lots just north of <br />E Sparks Road and Meadow Way intersection. These lots will be available for <br />sale with final plat recording. <br />Water Tank - Time: As negotiated with Easton Water District #3. <br />Water tank construction will be independent of Marian Meadows development and be <br />closely tied to efforts with the Water District. Expectations are for this to commence construction <br />prior to any single-family homes sales other than the 2 parcels located south of the Storage <br />complex. <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.