Exhibit F — Phasing and Timelines <br />➢ This portion of the project is again independent of other sections and can <br />develop as the market dictates. Expectations are for the type of housing to <br />follow the single-family housing commencement with building #1 likely to be <br />started on or before 2030 with build out by 2036 <br />Phase 7 — can be implemented at any time provided it meets <br />with KCC. <br />0 Large Parcel home sites — <br />➢ These sites are separate and stand-alone uses from Marian Meadows. While <br />included within the PUD, we request that they be viewed and handled by the <br />County as independent large parcel properties. Due to location and <br />characteristics unique to these parcels such as access, elevations and location, <br />we will be including these into the design and platting of adjacent property to <br />the South. <br />Page 3 of 3 <br />