My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
>
Meetings
>
2021
>
10. October
>
2021-10-19 2:00 PM - 2:00pm Public Hearing
>
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 1:54:14 PM
Creation date
10/14/2021 1:48:09 PM
Metadata
Fields
Template:
Meeting
Date
10/19/2021
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to consider Suncadia Phase 3 Division 17 Tumble Creek LP-21-00002.
Order
1
Placement
2:00pm Public Hearing
Row ID
82507
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This Revised Annual Background Growth Rate Assumption shall then be applied to determine <br />the County's share of any off-site traffic mitigation required as conditions of approval of any site <br />development plan and/or preliminary plat application filed after the first five-year period. <br />C-6 Proportionate Share. The applicant shall be responsible for its proportionate share of any <br />off-site traffic improvements described in Condition C-9, including any additional mitigation <br />measures for off-site improvements identified through the monitoring program described in <br />Condition C-17. Proportionate Share shall be calculated as follows: <br />a. First, the Projected Added Traffic Volume for the intersection or road segment shall be <br />calculated by subtracting the baseline traffic volume determined by the traffic counts <br />required by Condition C-5 from the total amount of traffic that is projected to be using <br />the road segment or intersection when the proposed phase or sub phase of the resort <br />development has been constructed and occupied. This projection must include both any <br />Background Grmvth projected as well as any traffic projections from the proposed phase <br />or sub phase of development based on the method of traffic projection in the EIS as may <br />be modified based on the results of monitoring. Summer weekend PM peak hour (Friday <br />afternoon through Sunday evening) shall be the time period used for measuring and <br />projecting traft]c volumes. <br />b. Second, the Added Traffic Volumes shall be divided into an MPR share and a County <br />share. The County's (or public) share shall be the Annual Background Growth Rate <br />Assumption described in Conditions C-5 and C-5A, multiplied by the number of years <br />between the date of this MPR approval (the "Effective Date''. as defined in the <br />Development Agreement) and the year in which the particular traffic improvement is <br />projected to be necessary to maintain the required level of service described in Condition <br />C-14. That Annual Background Growth Rate Assumption shall be determined as <br />described in Conditions C-5 and C-5A. The applicant's share shall be the difference <br />between the County share and the Total Added Traffic Volume. <br />c. Third, these resulting percentages for the County and the Applicant shall then be applied <br />to the total cost of the necessary improvements, including all costs to plan. design. <br />revie\v, permit, obtain funding, inspect and construct the improvement. All identified <br />off-site traffic improvements for which there is identified a public share shall be <br />incorporated, \vhenever possible, into the County· s Six-Year Transportation <br />Improvement Program to prioritize improvements generally consistent with projected <br />growth and proposed development of the MPR and to make use of available public <br />funding sources. The MPR propor1ionate share shall be calculated as follows (see also <br />Table A for illustrative purposes only): <br />A·!PR = (A,JPRVx-A1PRV<_1 )x lOO% <br />share TJI -TV <br />x x-1 <br />if TV_< -H'x-I :::;; 0, then MP R,1111 ," = 1 00% <br />C-7 Concurrenc'l. If the existing and projected traffic from a particular phase or subphase of <br />development being reviewed tbr site development plan or preliminary plat approval will cause <br />the level of service on affected intersections or road segments to fall below the accepted level of <br />Suncadia l'v1PR Conditions of Approval <br />December 2. 2008 <br />Page 18 <br />Index #32
The URL can be used to link to this page
Your browser does not support the video tag.