Laserfiche WebLink
C-3 Signal at Bullfrog Entrance. (Intentionally deleted) <br />C-4 Bullfrog/SR 903 Intersection. (Intentionally deleted) <br />C-5 Baseline Traffic Volumes and Initial Annual Background Growth Rate Assumption. The <br />applicant shall conduct traffic volume monitoring on August 25 through September 4. 2000. to <br />determine a baseline traffic volume for purposes of calculating proportionate share. Once this <br />baseline traffic volume data has been collected, it shall be compared to the traffic volume data <br />from the MPR-FEIS, collected in 1997, to determine an the Initial Annual Background Growth <br />Rate Assumption. which will be used in calculating proportionate shares for all traffic impact <br />mitigation assessed on site development plans and/or preliminary plat applications filed within 5 <br />years of the date of this MPR approval, the "Effective Date," as defined in the Development <br />Agreement The Initial Annual Background Growth Rate Assumption (''IBG'') shall be <br />calculated as follows: <br />RBG = (3 TV2000 -l]x 100% <br />TVI997 <br />REG= initial background growth rate <br />REG,..., =revised background growth rate after year 5 <br />TJ~, =total volume in year X <br />BV, =background volume in year x. defined as TV, -Jv!PRV, <br />AlP R V, = master planned resort volume in year x <br />If the resulting Initial Annual Background Growth Rate Assumption is substantially different <br />than that identified in the MPR-FEIS. then additional evaluation of an appropriate Initial Annual <br />Background GrO\\th Rate Assumption shall be completed by the County for determining <br />proportionate shares. <br />C-5A Revised Annual Background Gr0\\-1h Rate Assumption. After the first five years of traffic <br />impact mitigation proportionate share calculations based on the Initial Annual Background <br />Growth Rate Assumption determined in Condition C-5. the annual background growth rate <br />assumption shall be revised based on information provided in the monitoring reports required <br />pursuant to Condition C-17. This revised rate shall be calculated for each intersection or road <br />segment monitored based on the change in background traffic at that location over the previous 5 <br />years. The Revised Annual Background Gromh Rate (''RBG") shall be recalculated as follows: <br />Suncadia tv1PR Conditions of Approval <br />December 2, 2008 <br />Page 17 <br />Index #32