My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
>
Meetings
>
2021
>
10. October
>
2021-10-19 2:00 PM - 2:00pm Public Hearing
>
LP-21-00002 Suncadia Ph. 3 Div 17 Tumble Creek - Master File (Indexed)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 1:54:14 PM
Creation date
10/14/2021 1:48:09 PM
Metadata
Fields
Template:
Meeting
Date
10/19/2021
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to consider Suncadia Phase 3 Division 17 Tumble Creek LP-21-00002.
Order
1
Placement
2:00pm Public Hearing
Row ID
82507
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C-3 Signal at Bullfrog Entrance. (Intentionally deleted) <br />C-4 Bullfrog/SR 903 Intersection. (Intentionally deleted) <br />C-5 Baseline Traffic Volumes and Initial Annual Background Growth Rate Assumption. The <br />applicant shall conduct traffic volume monitoring on August 25 through September 4. 2000. to <br />determine a baseline traffic volume for purposes of calculating proportionate share. Once this <br />baseline traffic volume data has been collected, it shall be compared to the traffic volume data <br />from the MPR-FEIS, collected in 1997, to determine an the Initial Annual Background Growth <br />Rate Assumption. which will be used in calculating proportionate shares for all traffic impact <br />mitigation assessed on site development plans and/or preliminary plat applications filed within 5 <br />years of the date of this MPR approval, the "Effective Date," as defined in the Development <br />Agreement The Initial Annual Background Growth Rate Assumption (''IBG'') shall be <br />calculated as follows: <br />RBG = (3 TV2000 -l]x 100% <br />TVI997 <br />REG= initial background growth rate <br />REG,..., =revised background growth rate after year 5 <br />TJ~, =total volume in year X <br />BV, =background volume in year x. defined as TV, -Jv!PRV, <br />AlP R V, = master planned resort volume in year x <br />If the resulting Initial Annual Background Growth Rate Assumption is substantially different <br />than that identified in the MPR-FEIS. then additional evaluation of an appropriate Initial Annual <br />Background GrO\\th Rate Assumption shall be completed by the County for determining <br />proportionate shares. <br />C-5A Revised Annual Background Gr0\\-1h Rate Assumption. After the first five years of traffic <br />impact mitigation proportionate share calculations based on the Initial Annual Background <br />Growth Rate Assumption determined in Condition C-5. the annual background growth rate <br />assumption shall be revised based on information provided in the monitoring reports required <br />pursuant to Condition C-17. This revised rate shall be calculated for each intersection or road <br />segment monitored based on the change in background traffic at that location over the previous 5 <br />years. The Revised Annual Background Gromh Rate (''RBG") shall be recalculated as follows: <br />Suncadia tv1PR Conditions of Approval <br />December 2, 2008 <br />Page 17 <br />Index #32
The URL can be used to link to this page
Your browser does not support the video tag.