Laserfiche WebLink
Attachment 1 to Amendment 2 - Scope of Work <br />Amendment 2 Task 2: Prepare Final Design Package and Bidding Documents for <br />Lower Levee to l-90 Bridge Connection <br />Aspect will develop a Final Design Package for the lower levee to l-90 bridge connection <br />Aspect's Task 2 services include: <br />2.1 Refine and update prior hydraulic and drainage calculations as needed during the final <br />design process. <br />2.2 Prepare final revised Design Package for the lower levee to l-90 bridge connection. <br />2^3 Prepare final project specifications and special provisions. <br />2.4 Prepare final materials quantities and construction cost estimate, <br />2.5 Prepare a final project bid schedule. <br />2.6 Complete internalQA/QC review and submit the Final Design Package to the City <br />andlor County for use in contracting the construction work. These plans will also be <br />included in the County's CLOMR package to FEMA. <br />Task 2 Deliverables <br />Lower Levee ta l-90 Bridge Connection Final Design Package (pDF format):* Topographical basemap and final design and IESC on 11" x 17" plan sheefs.- Final standard details and specifications. <br />- Final special provisions and specifications.* Final engineers estimate of probable project cost.- Finalbid schedule. <br />Task 2 Assumptions <br />. Anly minor changes due to comments on the g0% design package (no new or significant <br />re-work). <br />r No major utility conflicts requiring significant utility relocation design effort.. No final design review cycle by the City or County.. No permitting support. <br />Amendment 2 Task 3: Prepare Levee Technical Report to Support Certification <br />and CLOMR Process <br />Aspect will complete analyses and prepare an overall Levee Technical Report to support the <br />CLOMR and levee certification process. Aspect's Task 3 services include: <br />3.1 Coordinating with WSE during completion of technicalanalyses. <br />3.2 Completing a field visit to review conditions and identify key levee segments for <br />detailed analyses. <br />3.3 Completing technicalanalyses (hydraulic, scour, stability, seepage, settling, interior <br />drainage) for key sections of the existing and proposed levee. <br />3.4 Preparing an overall draft Levee Technical Report to support the CLOMR and levee <br />certification process. The report will address items a though e mentioned earlier, and is <br />Reecer Creek Floodplain Mapping and Levee Certificotion Suppart Seryhes Project 4 | page