Laserfiche WebLink
v. A statement of the public comment period, which shall be not less than thirty (30) <br />days following the date of notice of application, and statements of the right of any <br />person to comment on the application, receive notice of and participate in any <br />hearings, request a copy of the decision once made, and any appeal rights. A local <br />government may accept public comments at any time prior to the closing of the <br />record of an open record pre-decision hearing, if any, or, if no open record pre- <br />decision hearing is provided, prior to the decision on the project permit; <br />vi. The date, time, place, and type of hearing, if applicable and scheduled at the date <br />of notice of the application; <br />vii. A statement of the preliminary determination, if one has been made at the time of <br />notice, of those development regulations that will be used for project mitigation <br />and of consistency; and <br />viii. Any other information determined appropriate by the local government. <br />e. Method. The notification system shall assure that notice to the general public and <br />property owners in the vicinity of such application is given by at least one of the <br />following methods: <br />i. Mailing of the notice to the latest recorded real property owners as shown by the <br />records of the county assessor within at least five hundred (500) feet of the <br />boundary of the property upon which the use or development is proposed; or <br />ii. Posting of the notice in a conspicuous manner on the property upon which the <br />project is to be undertaken. <br />5. Review and decision. The appropriate review authority identified in KCC 178.07.050 shall <br />review applications for compliance with review criteria in KCC 178.07.060 and either <br />approve, deny, or approve with conditions. ln the case of shoreline conditional use and <br />variance permits, the decision shall serve as a recommendation to the Washington State <br />Deparlment of Ecology, which is responsible for the final decision on shoreline conditional <br />use permits and variances. <br />6. Submittal to the Washington State Department of Ecology: <br />a-. After all local perm <br />and the permit documents amended to incorporate any resulting changes. Kittitas <br />County will mail the permit using return receipt requested mail to the Department of <br />Ecology regional office and the Office of the Attorney General. Projects that require <br />both Conditional Use Permits and or Variances shall be mailed simultaneously with any <br />Substantial Development Permits for the project <br />iew <br />preeeedir+grplans er texFshall be previded te the leeal gevernment that elearly <br />i <br />Exhibit C SMP Update 1178.07.070 Review Procedures Page 3 of4