My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution_LAG Agmt KPFF_NThorpHwyBridge
>
Meetings
>
2021
>
05. May
>
2021-05-04 10:00 AM - Commissioners' Agenda
>
Resolution_LAG Agmt KPFF_NThorpHwyBridge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 1:01:12 PM
Creation date
4/29/2021 12:58:39 PM
Metadata
Fields
Template:
Meeting
Date
5/4/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
g
Item
Request to Approve a Resolution to Award and Authorize Chair Signature on a Local Agency A&E Professional Services Consultant Agreement to KPFF, Inc. for the design and environmental permitting for the North Thorp Highway - Yakima River Bridge CRP 302-20.
Order
7
Placement
Consent Agenda
Row ID
75943
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 5.20 — Project Meetings & Coordination <br />KPFF will attend the following meetings for the construction phase of the project: <br />• Pre -Bid Meeting, two (2) hours in duration <br />• Pre -Construction Meeting, two (2) hours in duration <br />• Construction Meetings, assume eight (8) meetings, each two (2) hours in <br />duration <br />KPFF will coordinate with the County to discuss project issues, schedule, progress, and <br />general coordination of effort as needed. Anticipated coordination is expected to include <br />review of construction progress, answer informal questions from the County and/or <br />Contractor, and other similar tasks. <br />Assumptions: <br />The pre-bid meeting and pre -construction meetings are assumed to occur in- <br />person at the County offices or at the Contractor's field office in the Ellensburg <br />area. <br />Four (4) of the of the construction meetings are assumed to occur via tele/video <br />conference. The remaining four (4) meetings are assumed to occur at the bridge <br />site or at the County offices. <br />Deliverables: <br />Meeting agendas and notes (PDF) <br />Task 5.30 — Construction Submittal Reviews <br />KPFF will review and respond to submittals received during construction. Submittals <br />could include shop drawings, requests for approval of materials, scaffolding/containment <br />plans, repair procedures and other related items. For the purposes of this scope, it is <br />assumed that KPFF will review and respond to twenty-five (25) submittals. <br />Assumptions: <br />The County will collect and distribute submittals and KPFF's responses to/from <br />the Contractor. <br />Deliverables: <br />P Review and provide responses to construction submittals (PDF) <br />Task 5.40 — Requests for Information (RF1s) <br />KPFF will review and respond to RFIs received during construction. For the purposes of <br />this scope, it is assumed that KPFF will review and respond to fifteen (15) RFls. <br />
The URL can be used to link to this page
Your browser does not support the video tag.