Laserfiche WebLink
public tneetings on line was selected. The proposed conmact will be brought to the next Council <br />meeting on05/26/2020. Council member Harper commented Zoom has had some publicity about <br />their lack of security and suggested we look into the progress that has been made to fix the <br />problem before using Zoom ds an on-line meetingforum, <br />Publig lVorhs Directsr - Mlkc Ensclhart;r Reported Public Works has been monitoring public safety issues; to that end, Public <br />Works has replaced sidewalks where there have been tripping hazards. Engelhart praised his <br />team for their good work,r Reported the Ccmctery irrigation sysrem was furned on 05/l I/2020.I Reported Public Works has installed guardrails on Stafford Street Hiil, Other areas of <br />town will also have guardrails installed as money for materials becomes available.o Reported Strider Construcdon is moving ahead with the First Street Stormwater Project; <br />curbs and gutters will be poured next week, as well as sidewalk repairs, prepping and setting up <br />detours so the crossings cat be re-poured. The contractor crews are filling the crossing holes <br />with gravel twice daily. <br />Counci! member Beth Williams asked if the city has completed putting asphalt in the ulleys, <br />Engelhart responded the City ran out of asphalt, The contractor brought in more asphalt, which <br />is being slored at a counly pit sile. More material may be placed nert spring. Council member <br />Harper commented the guardrail on Statlord looks great and can potentially save lives. <br />Vcolia Renorf_- Mike Enrclhart for_Wllliam l.aRue:r Reported to Council William LaRue was unable to attend due to the death of a f'amily <br />member, <br />r Graphs of the Water Plant Flows, Run Time, Precipitalion, Wastewater Flow and Water <br />plant vcrsus Wastewater Plant Flows for April 2020 were provided in the Counsil packets.r Reported the Fast settling basin at the Water Treatment Plan has been taken oflline for <br />drying and clcaning; it should be dry enough to remove the solids in late August.r Rsported lnfaSource will be onsite in May to clean the yard. fill the divots and trench <br />wilh topsoil and re-seed where the gas line was run across the yard.I Reported a failure ofone ofthe original Variable Frequency Drives on a Suncadia <br />irrigation pump at the begilning of May. The VFC is 15 years old, is obsolete and no longer <br />supported by the factory, One quote for the equipment has come back at $25,000. Mr. LaRue is <br />waiting for quotes from elecfrical conhactors for the installation costs. He is also researching the <br />costs of spare parts to rebuild the failed drive. Details will be brought back to council when <br />available. <br />r Reported Veolia staff completed the bi-annual sludge inventory of the lagoon at the <br />Wastewater Treatment Plant; sludge levels have not increased and are averaging 3 feet in depth <br />with approximately 4 feet of storage area remaining within the lagoon.r Reporled Veolia staff installed the aerators in the lagoon for mixing and to increase the <br />dissolving oxygen levels during wanner surnmer months.. Reported Veolia staff completed the annual cleaning of the inlct channel, bar screens and <br />grit chambers. There was a larger than normal level of gravel removed, mostly likely due to the <br />extreme inlluent flow experienced during the flooding conditions in February. <br />Police Chief; Kirk Bland;r Reported there has treen an increase in calls over the past weekend due to the increase in <br />people in town; the City will probably see more people in town from now on through the surnmer,I Reported normal police department projects have been pul on hold due to the Covid- 19 <br />virus. <br />. Reported the cut sfeet crossings due to the Stormwater project made a great speed <br />deterrent and is sorry to see them being filled in. <br />2