My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2021-063
>
Meetings
>
2021
>
04. April
>
2021-04-20 10:00 AM - Commissioners' Agenda
>
Res-2021-063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2021 1:41:09 PM
Creation date
4/22/2021 1:40:52 PM
Metadata
Fields
Template:
Meeting
Date
4/20/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
k
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Non-Discrimination Agreement (NDA) for 2021 and Title VI Annual Accomplishment Update Report for 2018, 2019 and 2020 with the Washington State Department of Transportation (WSDOT) for a Local Agency under 100,000 Population
Order
11
Placement
Consent Agenda
Row ID
75326
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Non-Discrimination Agreement <br />Annual Report <br />Population Under 100,000 <br />APPENDIX A 2019 CONTRACTS <br />Task order 17 fo( 2oL9 Bridge lnspection <br />Services KPFF Consulting Services 106,000.00s L/28/2019 RES #2019-0L5 <br />Task Order 1 General Environmental and <br />Planning Services Jacobs Engineering Group s 100,000.00 2/s/2019 RES #2019-026 <br />Rock Materials Schedule A,B&C for 2019 Ellensburg Cement Products, lnc.5 784,890.00 2/sl20t9 RES f2019-029 <br />Task Order 16 Extending Date for Fairview <br />Road Culvert Replacement Project Jacobs Engineering Group s 2/L9/20L9 RES #2019-032 <br />Crack Sealant Materials for 2019 Special Asphalt Products 79,634.79s 3/s/20t9 RES #2019-043 <br />Asphalt Materials for 2019 Granite Construction Company s 248,184.00 3/s/2079 RES #2019-044 <br />Liquid Asphalt Materials for 2019 Western States Asphalt, lnc.s 1,473,633.00 3/s/201s RES #2019-045 <br />Upper County Traffic Task Force Modeling <br />services Fehr & Peers )50,000.00 3/5/20L9 RES #2019-046 <br />Design, Fabricating, Finishing a Steel Modular <br />Bridge for Big Boulder Bridge Replacement <br />project Big R Bridge s 48,190.68 3/rL/20t9 RES #2019-051 <br />Herbicide Application f ot 2079-2022 Woodland Resource Services s 25,056.00 4122/20L9 RES #2019-073 <br />Task Order 6,03 Weihl Road Improvements KPG, PS 86,287.00s s/28/20L9 RES #2019-086 <br />2019 Annual Paint Stripe Program Stripe Rite 267.526.00s 6/4/2019 RES #2019-091 <br />Task Order 16 Additional funding for Big <br />Boulder creek Bridge Replacement Project <br />Design KPFF Consultins Services s 20,000.00 6/t0/2079 RES #2019-099 <br />Addition of Wood planks to bridge deck for <br />Steel Modular Bridge for Big Boulder Bridge <br />Replacement project.Big R Bridge 9,329.00s 6/Lo/20t9 RES #2019-100 <br />Teanaway Road Hydraulic lmprovements <br />Phase 1: Story Creek Culvert Replacement Hurst Construction 70t,231.00s 6/78/2079 RES S2019-105 <br />Weihl Road lmprovement Proiect Granite Construction Company 773,258.75s 6/24/20L9 RES #2019-107 <br />Task Order 16.02 lncrease amount for <br />Fairview Road Culvert Replacement Design <br />services Jacobs Engineering Group 51,200.00s 6/24/20!9 RES #2019-108 <br />Desi8n of Reecer Creek and University Way <br />Traffice Signal SCJ Alliance L29,750.00s 712/20L9 RES #2019-112 <br />Big Boulder Creek Bridge Replacement <br />Proiect Thayer Excavating 92,106.00s 7/2/2019 RES #2019-113 <br />Design and Environmental permitting for <br />Kachess Lake Road Culvert Replacement Jacobs Engineering Group s 209,600.00 8/!2/2019 RES #2019-127 <br />Design and Environmental permitting for <br />Naneum Road Culvert Replacement Jacobs Engineering Group s 279,600.00 8/7212019 RES S2019-128 <br />Design and Environmental permitting for the <br />Vantage Highway Coleman Creek Culvert <br />Replacement Proiect KPG, P5 308,s37,005 919/20L9 RES #2019-141 <br />Task Order 16.3 increase amount for design <br />services for Big Boulder Creek Bridge <br />Replacement.KPFF Consulting Services s 20,000.00 7th2/20L9 RES #2019-167 <br />Petroleum and Lubricant Products for 2020 <br />Schedule A A-1 Petroleum Profit Margin 20%r1./19/20].9 RES #2019-170 <br />Petroleum and Lubricant Products for 2020 <br />Schedule B Amerifuel Profit Margin 30%Lrhg/2019 RES #2019-170 <br />Petroleum and Lubricant Products for 2020 <br />schedule C Co-Energy 5 20,477.54 L1./L9/2019 RES f2019-170 <br />2020 Snow & lce Control Products (Non <br />Corrosion lnhibited)Rankin Products LLC S97.oolton L2/3/2019 RES #2019-18L <br />2020 Snow & lce Control Products <br />(Roadsaver)Roadwise. lnc.5 151.2slton 12/3/20!9 RES #2019-181 <br />Amendment 3 to Design of the Teanaway <br />Hydraulics lmprovement Proiect Jacobs Engineering Group s 88,600.00 t2/L712019 RES #2019-201 <br />VendorDescription of Contract Amt of Contract Date Signed Agreement Number <br />8
The URL can be used to link to this page
Your browser does not support the video tag.