My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2021-063
>
Meetings
>
2021
>
04. April
>
2021-04-20 10:00 AM - Commissioners' Agenda
>
Res-2021-063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2021 1:41:09 PM
Creation date
4/22/2021 1:40:52 PM
Metadata
Fields
Template:
Meeting
Date
4/20/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
k
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Non-Discrimination Agreement (NDA) for 2021 and Title VI Annual Accomplishment Update Report for 2018, 2019 and 2020 with the Washington State Department of Transportation (WSDOT) for a Local Agency under 100,000 Population
Order
11
Placement
Consent Agenda
Row ID
75326
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Non-Discrimination Agreement <br />Annual Report <br />Population Under 100,000 <br />APPENDIX A 2O2O CONTRACTS <br />Rock Materials for 2020 Ellensbure Cement Products 913,653,00 RES il2020-035 <br />Liquid Asphalt Materials tor 2020 Schedule A Western States Aspalt 7,722,066.00 3/3l2O2C RES f2020-037 <br />Liquid Asphalt Materials for 2020 Schedule B Albina Asphalt 7,607,673.OO 3/3/2024 RES #2020-O37 <br />Asphalt Materials tor 2020 Columbia Asphalt 267,744.00 @ RES f2020-038 <br />crack sealant Materials for 2020 Schedule A Special Asphalt Products 20,674.47 3/3/2024 RES f2020-039 <br />Crack Sealant Materials for 2020 Schedule B Arrow Construction 27,76a.30 3/31202A RES #2020-039 <br />On-call Task Order Consultant for up to 3 years for <br />Engineering and Standard Professional Services Contracts <br />Environmental Jacobs Environmental less than $50,oo0 per task order 4/7/2020 RES #2020-074 <br />On-Call Task Order Consultant for up to 3 years for <br />Engineering and Standard Professional Services Contracts <br />Environmental ESA less than S50,000 per task order 4/7/2020 RES #2020-074 <br />on-call Task Order Consultant for up to 3 years for <br />Engineering and Standard Professional Seryices Contracts <br />Structural Engineering Tran Tech less than S50,000 per task order 4/7 /2o2(RES *2020-075 <br />On-Call Task Order Consultant for up to 3 years for <br />Englneering and Standard Professional Services Contracts <br />Structural Ensineerine KPFF less than S50,000 per task order 4/7 /202C RES #2020-075 <br />On-Call Task Order Consultant for up to 3 years for <br />Engineering and Standard Professional Services Contracts <br />f ransportation Plannlng Fehr and Peers less than S50,000 per task order 4/7 /2o2c RES #2020-076 <br />On-Call Task Order Consultant for up to 3 years for <br />Engineering and Standard Professional Services Contracts <br />Transportation Planning SCJ Alliance less than S50,000 per task order 4/7/202c RES #2020-076 <br />On-Call Task Order Consultant for up to 3 years for <br />Engineering and Standard Professional Services Contracts <br />Civil Engineering KPG less than S50,000 per task order 4/7/202c RES *2020-077 <br />On-Call Task Order Consultant for up to 3 years for <br />Engineering and Standard Prof€ssional Services Contracts <br />Clvil Ensineerins HLA less than 55o,0oo per task order 4/7/2020 RES fi2020-O77 <br />On-Call Task Order Consultant for up to 3 years for <br />Engineering and Standard Professional Services Contracts <br />Material Testing Baer Testing less than $50,000 per task order 4/1/202a RES #2020-078 <br />On-Call Task Order Consultant for up to 3 years for <br />Engineering and Standard Professional Services Contracts <br />Material Testing GeoProfessional lnnovation less than 950,000 per task order 4/7/2020 RES #2020-078 <br />On-Call Task Order Consultant for up to 3 years for <br />Engineering and Standard Professional Services Contracts <br />Hydraulic and Hydrology Engineering Watershed Science less than SSO.O00 ber task order 411?12020 RES f2020-040 <br />On-Call Task Order Consultant for up to 3 years for <br />Engineering and Standard Professional Services Contracts <br />Hydraulic and Hydrology Engineering Northwest Hvdraulic Consultants less then Sso.ooo ber task ordEr L11212020 RES #2020-080 <br />Procurement Contract for 60 Ft Meter Girder Bridge for <br />Bic Boulder Creek Bridee Replacement Prolect Contech Engineering 75,969.00 4/27/2o2o RES *2020-O87 <br />Kittitas Maintenance Blew's Construction, lnc.5,277,O7A.OO RES #2020-096 <br />Teanaway Hydraulic lmprovements Phase 2: Lick Creek <br />Culvert Replacement J&KEarthworks,lnc,1,252,380.00 5/rs/2020 RES f2020-106 <br />Annual Paint Stripe Program Stripe Rite, lnc.2s3,496,70 s/79/202C RES f2020-107 <br />Coleman Creek Culvert Replacement at Vantage Highway Belsaas & Smith 793,810.00 6/8/2o2C RES #2020-115 <br />Fairview Road Widening and Coleman Creek Structures <br />Replacement Advantage Dirt Contractors 819,864.00 61761202(RES f2020-120 <br />Big Boulder Bridge Replacement Morgan and Sons Earthmoving 360,430.00 6/16/2O2C RES #2020-121 <br />Task Order 2 - 2020 Eridge lnspection Spoort Services KPFF 55,000.00 817812O2(RES #2020-146 <br />Bulifrog Road Pavement Project American Rock Products 367.763.00 8/L8l2O2(RE5 S2020-147 <br />Snow & lce Control Products for 2021 (Meltdown <br />inhibited)Envirotech Services lnc.S183.33/ton [/3/202C RES S2020-180 <br />Snow & lce Control Products for 2021 (Melt down Apex <br />c)Envirotech Services lnc,s224.2Albn 77/3/2O2(RES #2020-180 <br />Snow & lce Control Products for 2021 (Solid Sodium <br />chloride)Pioneer Commodities S1o7.oo/ton 17/3/202C RES *2020-180 <br />Snow & lce Control Products for 2021 (Non Corrosive <br />Solid Sodium chloride)Rankin Products, LLC S99.oo/ton 77/3/202t RES *2020-180 <br />RES S2020-180 <br />Deslgn and Environmental permltting for Pavement and <br />Guardrail replacement on Vantage Highway KPG P.S.348,995.00 17/3/2O2C RES #2020-185 <br />Task order 5.2 additional funding for design servlces <br />supporting Upper County Road Maintenance Facility KPG P.S.35,000.00 77117/202C RES #2020-190 <br />Petroleum and Lubricant Products for 2021 Schedule A <br />and C A-1 Petroleum Ptofil Margin 27Yo 12/7s/202C RES S2020-220 <br />Petroleum and Lubricant Products for 2021 Schedule B Amerifuel Profit Margin 30%'J.2/ t sl 2O2E RES tr2020-220 <br />Description of contract Amt of contractVendor Date Signed Agreement Number <br />9
The URL can be used to link to this page
Your browser does not support the video tag.