My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2021-063
>
Meetings
>
2021
>
04. April
>
2021-04-20 10:00 AM - Commissioners' Agenda
>
Res-2021-063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2021 1:41:09 PM
Creation date
4/22/2021 1:40:52 PM
Metadata
Fields
Template:
Meeting
Date
4/20/2021
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
k
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Non-Discrimination Agreement (NDA) for 2021 and Title VI Annual Accomplishment Update Report for 2018, 2019 and 2020 with the Washington State Department of Transportation (WSDOT) for a Local Agency under 100,000 Population
Order
11
Placement
Consent Agenda
Row ID
75326
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Non-Discrimination Agreement <br />Annual Report <br />Population Under 100,000 <br />APPENDfX A: TRANSPORTATION RETATED CONTRACTS WHICH WERE EXECUTED 20t8,20L9,2020. <br />APPENDIX A 2018 CONTRACTS <br />Petroleum and Lubricant Products for 2018 <br />schedule A A-1 Petroleum Profit Margin 18%1.h6/2078 RES #2018-012 <br />Petroleum and Lubricant Products for 2018 <br />Schedule C A-1 Petroleum Profit Marein 18%L/L6/2018 RES fi20r.8-012 <br />Petroleum and Lubricant Products for 20L8 <br />schedule B Amerifuel Profit Margin 30%Lh6/20t8 RES #2018-012 <br />Task Order 5 Upper County Road Maintenance <br />Facility Replacement Project KPG, P.S 4L7,37 4.29s 7/1612018 RES #2018-013 <br />Task Order 8 Budget lncrease for Design Services <br />for No.6 Road Bridge Replacement KPFF Consulting Engineers 93,350.00s 2/26/20t8 RES #2018-034 <br />Chemical/Weed Spray Materials for 2018 Helena chemical company 82,050.22s 3/6/20L8 RES #2018-040 <br />Asphalt Materials Schedule A & B for 2018 Granite Construction Company 248,L84.Q0s 3/6/2078 RES f2018-041 <br />Asphalt Materials Schedule A & B for 2018 columbia Asphalt and Readv Mix 265,464.O05 3/6/2018 RES #2018-041 <br />Liquid Asphalt Materials Schedule A & B for 2018 Western States Asphalt, lnc.1,103,922.00s 3/6/2018 RES #2018-042 <br />crack sealant Materials schedule A & B for 2018 Special Asphalt Products 19,800.605 3/6/20rt RES #2018-043 <br />Rock Material Schedule A,B, & C for 2018 Ellensburg Cement Productsl, Inc.737,370.OOs 3/6/20L2 RES #2018-044 <br />Task Order 12 Bridge lnspection Services KPFF Consulting Engineers 47,000.00s 3/6/20L8 RES #2018-045 <br />Task Order 3 Civil Engineering Services for <br />Teanaway Hydraulic lmprovements Project Jacobs Enginering Group t70,423.OOs s/t/20L8 RES #2018-074 <br />Paint Striping Program for 2018 Stripe Rite lnc.246,12L.70s sl29/20L8 RES #2018-084 <br />No 6 Bridge Replacement Proiect Belsaas & smith 566,1s0.00$6/s/2018 RES #2018-093 <br />Manastash Road Bridge Replacement Project Belsaas & Smith 1,767,O3A.OOs 6h9/2018 RE5 #2018-105 <br />University WaV Bridge Repair Belsaas & Smith 239,1 16.005 7 /30/2018 RES #2018-118 <br />2018 Kittitas County Safety lmprovement Project Frank Gurney, lnc.729,534.635 8/27 /2018 RES #2018-137 <br />Task Order 16 Fairview Road Culvert Replacement <br />PE Phase Jacobs Enginering Group 222,O25.00$8/27/20!8 RES #2018-138 <br />Task OrderAmendment 1.03 lncrease amountfor <br />Manastash Bridge Replacement Support Services Jacobs Enginering Group s 301,103.00 9/7012018 RES #2018-146 <br />Task Order 16 Big Boulder Creek Bridge <br />Replacemnet Engineering and Construction <br />Services KPFF Consulting Engineers s 173,000.00 L0/2/20L8 RES #2018-160 <br />Snow & lce Control Products for 2019 (Meltdown <br />I nhibited)Envirotech Services lnc.S179.solton L7/20/20L8 RES #2018-178 <br />Snow & lce Control Products for 20L9 (Calcium <br />Chloride)Envirotech Services lnc.5228.64/ton tL/20/2078 RES #2018-178 <br />Snow & lce Control Products for 2019 (lce Slicer <br />Rs)Envirotech Services lnc.51.67.7s/ron rLl20/2018 RES #2018-178 <br />Snow & lce Control Products for 2019 (Non <br />Corrosion lnhibited)Rankin Products, LLC S91.00/ton rL/20/2018 RES #2018-178 <br />Snow & Ice Control Products for 2019 (Liquid <br />Magnesium Chloride)Roadwise, lnc.S151.25lton lL120120L8 RES #2018-178 <br />Task Order 8 Budget lncrease for Design Services <br />for No,6 Road Bridge Replacement KPFF Consulting Engineers 3,000.00s rt/20/2018 RES #2018-184 <br />Task Order 1.6 Budget I ncrease for Design Services <br />for Bia Boulder Creek BridseReolacement.KPFF Consulting Engineers s 35,000.00 12/r0/20L8 RES #20r.8-203 <br />Petroleum and Lubricant Products for 2019 <br />Schedule A A-L Petroleum Profit Marsin 20%12h8/20!8 RES #2018-222 <br />Petroleum and Lubricant Products for 2019 <br />Schedule C Co-Energy 19,473.26s 72/L8/2018 RES #20L8-222 <br />Petroleum and Lubricant Products for 20L9 <br />Schedule B Amerifuel Profit Margin 30%12/L8/2018 RES #2018-222 <br />Description of Contract Vendor Amt of Contract Date Signed Agreement Number <br />7
The URL can be used to link to this page
Your browser does not support the video tag.