Laserfiche WebLink
under the Planned Unit Development (PUD) Ordinance (PD 17-00001), Conditional Use Permit <br />(CU -17-00001) and Plat (LP17-0001). <br />2.1 Project Duration. The Project is anticipated to be phased over a twenty-year (20) <br />period. The Developer will have discretion to determine the order of phasing elements to <br />maximize work around the quarry buffer zone while allowing quarry operations to <br />continue to supply minerals and material to the development. Further information on <br />Project Phasing and Timelines is included in the attached Exhibit F. <br />2.2 Supportive Facilities. The Project will include supportive facilities such as a <br />community center, athletic courts, a pool, solid waste handling facilities, roads, mail <br />collection/distribution facilities and a trail network. <br />2.3 Project Oversight, Operations and Management. Until oversight, operations and <br />ownership is transferred to MMOA as provided in Section 2.4 below, the Developer <br />shall be responsible for all requirements set forth in this Development Agreement. <br />2.4 Transfer of Oversight, Operations and Ownership to Marian Meadows Ownership <br />Association. Within thirty days following the end of the Development Period, but in no <br />case later than sixty days after Developer has transferred title to the purchasers of single- <br />family residences representing 75% of the 85 residences (meaning 64) to be included in <br />the MMOA, Developer shall deliver or cause to be delivered to MMOA all community <br />property, oversight, and operations as provided for in Chapter 64.90 RCW, the <br />Washington Uniform Common Interest Ownership Act. Developer reserves the right to <br />deliver the same at any time allowed by law. The MMOA will assume total oversight, <br />control and authority over the developed portion of the Project and work with the <br />Developer until final build out. <br />Section 3. Residential Development. The Property described in Exhibit A will be developed <br />into the Plat of Marian Meadows Estates, an 89 -lot residential subdivision over approximately <br />170 acres, including 73 single-family lots, 12 multi -family townhomes and 4 large residential <br />lots. <br />3.1 Seventy -Three Single -Family Lots. There will be 73 fee -simple lots of 1/2 acre in size <br />or larger, which will contain one single-family residence and/or assessor unit with or <br />without detached out buildings, a water connection from Easton Water District and an <br />on-site septic system. <br />3.2 Twelve Multi -Family Townhomes. There will be 12 attached multi -family units for <br />sale, lease or rent. These units may be inclusive of enclosed or open parking structures <br />and will share and support Marian Meadows Estates equal to the single-family uses. <br />3.3 Four Single -Family Large Lots. There will be 4 large parcels (67-95 acres in size) on <br />the eastern slope of the Project that consist of a single-family residence with associated <br />out -buildings, on-site septic, and may or may not include a water service connection to <br />Easton Water District. These 4 parcels will not be members of the Marian Meadows <br />Development Agreement — Page 4 of 12 <br />