My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DV-19-00001 Marian Meadows Development Agreement Master File
>
Meetings
>
2020
>
10. October
>
2020-10-06 2:00 PM - 2:00pm Public Hearing
>
DV-19-00001 Marian Meadows Development Agreement Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:55:20 PM
Creation date
10/1/2020 1:41:42 PM
Metadata
Fields
Template:
Meeting
Date
10/6/2020
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Marian Meadows Development Agreement (DV-19-00001)
Order
1
Placement
2:00pm Public Hearing
Row ID
67284
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30.2.5 The FEIS identified additional equipment to mitigate Fire and Medical Response <br />impacts associated with the project. Project contribution to these measures is identified <br />in the FEIS. Such contributions can be made a condition of a Development Agreement, <br />with amounts identified appropriate to the 89 unit current proposal. The applicant shall <br />contact the Kittitas County Fire District #3 to determine appropriate mitigation <br />measures. Mitigation measures shall be included in the development agreement. <br />30.3 Schools <br />31 Utilities <br />The FEIS examines impacts to the Easton School District. Impacts of the current proposal are <br />most similar to those identified in Alternatives 3D and 5. The FEIS suggests project <br />contribution to increased District costs. Such contributions can be made a condition of a <br />Development Agreement. The applicant shall contact Easton School District and develop <br />mitigation measures. Mitigation measures shall be included in the development agreement. <br />1.1 Sewer <br />31.1.1 Residential lots will be served by an On-site septic system. <br />31.1.2 The RV Complex shall be served with a Large On-Site Septic System designed to DOH <br />standards with oversight by DOH /Satellite Management. <br />31.1.3 Prior to any development on the steeper eastern slopes, a sewage disposal master plan <br />shall be submitted to Kittitas County Environmental Health . <br />31.2 Stormwatcr Management <br />31.2.1 Stormwater plans submitted to CDS shall depict design standards showing pervious <br />construction methods with a focus on retention and infiltration. <br />31.2.2 Development shall comply with the Ecology Stormwater Management module Eastern <br />Washington. <br />31.3 Electric Utilities <br />3 1.3 .1 The plat map shall include the following note: <br />"The Bonneville Power Administration imposed certain conditions on the portions of <br />these lots encumbered by its high voltage transmission line right-of-way. BPA does not <br />allow structures to be built within the right-of-way, nor does it allow access to be <br />blocked to any transmission facilities. Any activity that is to occur within the right-of <br />way may be addressed to BPA real Estate Field Services at (877) 417-9454". <br />31.3 .2 BP A shall be allowed the opportunity to review the location of proposed roads, use of <br />existing access roads, snow storage, utilities, etc. to ascertain whether or not the uses <br />29
The URL can be used to link to this page
Your browser does not support the video tag.