My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DV-19-00001 Marian Meadows Development Agreement Master File
>
Meetings
>
2020
>
10. October
>
2020-10-06 2:00 PM - 2:00pm Public Hearing
>
DV-19-00001 Marian Meadows Development Agreement Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:55:20 PM
Creation date
10/1/2020 1:41:42 PM
Metadata
Fields
Template:
Meeting
Date
10/6/2020
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Marian Meadows Development Agreement (DV-19-00001)
Order
1
Placement
2:00pm Public Hearing
Row ID
67284
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
can be permitted. The owner shall submit a land use application, the associated $250 <br />application fee, and acquire a Land Use Agreement from BPA in addition to the <br />County's building permit for any portion of the owner's development plans that lie <br />within BPA's right-of-way. <br />31.4 Water <br />31.4. l Marian Meadows/Easton Water District shall confirm an intended connection to the <br />Easton Water District , and then submit estimated water usage quantities, so that DOH <br />can determine whether the precise number of new connections that are proposed for <br />Marian Meadows can be served by the existing system, or apply for a new Group A <br />Community public water system with the DOH Office of Drinking Water. <br />31.4 .2 Marian Meadows shall identify how wastewater will be managed. <br />31.4 .3 The Applicant shall submit documentation and engineering design for proposed water <br />extension to DOH for the review and approval. <br />32) V,i ual OuaJ1ly. L ight and lare <br />As described in the FEIS, visual impacts can be mitigated through the following methods , and such <br />methods are conditions of approval: <br />32.1 Road cuts shall be revegetated with native coniferous trees. <br />32.2 Outdoor lighting shall be shielded and directed downward. <br />33) Noise <br />Noise impacts are discussed on pg. 3-227 of the FEIS . <br />33.1 When possible, construction activities shall be limited to daylight hours. <br />33.2 KCC 9.45.040 exempts construction from noise ordinances between the hours of6:00 am and <br />I 0:00 pm. Should circumstances require work outside of these hours , the applicant shall apply <br />for a variance with the Board of County Commissioners pursuant to KCC 9.45.070. <br />34) Air Quality <br />34 .1 The project shall comply with all applicable local , state and federal laws regulating air quality. <br />34.2 Current quarry work will impact air quality. Quarry operations will be amended as the <br />development moves north. Quarry operations will continue and provide resource materials <br />needed for the development. Once residential vertical build out is within 250' if quarry <br />operations, operations will cease and reclamation will commence. <br />30
The URL can be used to link to this page
Your browser does not support the video tag.