My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DV-19-00001 Marian Meadows Development Agreement Master File
>
Meetings
>
2020
>
10. October
>
2020-10-06 2:00 PM - 2:00pm Public Hearing
>
DV-19-00001 Marian Meadows Development Agreement Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:55:20 PM
Creation date
10/1/2020 1:41:42 PM
Metadata
Fields
Template:
Meeting
Date
10/6/2020
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Marian Meadows Development Agreement (DV-19-00001)
Order
1
Placement
2:00pm Public Hearing
Row ID
67284
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
proposed $500 per residential unit (total of 89 units) was determined to be sufficient <br />to mitigate for project impacts to the school district. Patrick Dehuff, Ed.D., Easton <br />School District Superintendent submitted a letter to Kittitas County on July 22, 2019 <br />stating that the proposed monetary mitigation is not sufficient and that the applicant <br />has not contacted to the school district as required and explained above. The <br />applicant must provide documentation regarding negotiations and agreement of <br />appropriate mitigation for the Easton School District to Kittitas County Community <br />Development Services to meet their obligations as outlined in Ordinance 2018-006. <br />Please update the draft Development Agreement and associated Exhibits <br />accordingly. Please see updated comments. <br />Public Works - Mark Cook, PE, Director, P: 509-962-7523, E: mark. cook&co.kittitas.wa.us <br />(Please see the attached Public Works Memo dated July 23, 2019. Each issue/item <br />identified within this memo must be addressed. Public Works comments have been <br />provided below for convenience.) <br />• Engineering: <br />1. Specify the quantity of campsites and RV sites. Please see DA Section 4. <br />2. Identify access to Lot 19 on the RV layout Illustration. Within record Pub. <br />Works Question #6. Attachment 2. <br />3. Pursuant to Ordinance No. 2018-006, Public Works' condition of approval I I <br />.3.9 requires a right-of-way (ROW) with sufficient width to allow for the storage <br />of snow within that space without impacting the travel lanes. Public ROW is 60" <br />wide plus additional land set aside (1 acre) as snow storage. See engr. Drawings <br />and Attachment 3. A question is ownership of this tract of land: condition # 18 <br />requires this to be dedicated Public ROW. <br />4. The second RV Layout Illustration and RV commercial maps show a fire lane of <br />14'. Fire lane must be 16'. Acknowledged. Attachments 3 & 4. <br />5. Private roads shall comply with the design requirements of 12.04.070 & <br />12.04.080 Table 4-4 of the Kittitas County 2015 Road Standards. See Exhibit D <br />to the Development Agreement and its attachments. We make numerous <br />references that roadway will comply with WADOT and KCC standards. <br />6. The extension off Meadows Way illustrates one access. A second access is <br />required if more than 30 (thirty) lots/units will use the private road per <br />12.01.095. Meadow Way is an in -network Kittitas County road way which <br />extends into a round -a -bout where private roads extend from and loop back to. <br />See engineered drawings and Attachment 3. <br />7. The Airport Safety Zone Map is unclear. Provide a legend defining each color. <br />Attachment 5. <br />8. Phasing is unclear. Clarify the specific phases in numeric order. The water tank <br />and looped water line will be constructed prior to any final platting. Once these <br />are in place, and with the extension of Meadow Way, differing portion of <br />platting can take place independent of other portions. See Exhibit F to the <br />Development Agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.