My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DV-19-00001 Marian Meadows Development Agreement Master File
>
Meetings
>
2020
>
10. October
>
2020-10-06 2:00 PM - 2:00pm Public Hearing
>
DV-19-00001 Marian Meadows Development Agreement Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 1:55:20 PM
Creation date
10/1/2020 1:41:42 PM
Metadata
Fields
Template:
Meeting
Date
10/6/2020
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider the Marian Meadows Development Agreement (DV-19-00001)
Order
1
Placement
2:00pm Public Hearing
Row ID
67284
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. How can the water tank construction be independent of Marian Meadows <br />development as it is a critical part of the development's infrastructure? Please <br />explain. Marian Meadows is dependent on a water system to be put in place but <br />the water system improvements are needed with or without this plat. Once the <br />water tank and looped water line is in place, each phase/division can be <br />constructed with full services provided it meets KCC. <br />10. Define the new commercial and recreational traffic impacts. This was included <br />within the TENW report; please refer to it for answers. <br />• Water: <br />1. The included materials do not indicate that the conditions identified in Ordinance <br />2018-006 have been met. Pertinent comments from Ordinance 2018-006 include: <br />a. The Department of Health requires that: Marian Meadows/Easton Water <br />District shall confirm an intended connection to the Easton Water District, and <br />then submit estimated water usage quantities, so that DOH can determine whether <br />the precise number of new connections that are proposed for Marian Meadows can <br />be served by the existing system, or apply for a new Group A Community public <br />water system with the DOH Office of Drinking Water. Please see water <br />comments. <br />b. Kittitas County Environmental Health requires that the applicant must provide <br />written documentation from the water purveyor indicating the water district commits <br />the appropriate number of connections for the entire project (made therefore <br />unavailable to any other lots) prior to final signoff. Please see water comments. <br />2. In Exhibit F — Conditions, section 31.4.1 indicates that the Marian Meadows/Easton <br />Water district shall confirm an intended connection to the Easton Water District and <br />then submit estimate water usage quantities. The application is not clear about the <br />estimated water usage quantities, in part because 31.4.1 B ERU analysis is not <br />included (Table 4 from DOH 337066 document is attached, with design flow rates <br />for campgrounds, but the included materials do not clearly identify the quantity of <br />water needed for the RV park and campground, not the RV retail and service. Please <br />see water comments. <br />3. Material provided should also be clear if the application covers the 33 residential <br />units proposed in the application, or the 89 residential units identified in Ordinance <br />2018-006). Neither is there documentation demonstrating that the Easton Water <br />district is able to provide _ connection. The attached certificate of water availability <br />expired on 5/17/2018 and the included Kittitas County Water District No 3 <br />resolution, signed 3/9/2004 is also expired. Documentation supporting the <br />acceptance of the water purveyor for the projects, phasing, and timelines identified <br />in Exhibit E (looped water line and water tank) is needed. Please see water <br />comments. <br />• Survey: <br />Required Corrections <br />
The URL can be used to link to this page
Your browser does not support the video tag.