My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2020
>
07. July
>
2020-07-07 10:00 AM - Commissioners' Agenda
>
2020-06-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2020 3:03:02 PM
Creation date
7/2/2020 3:01:43 PM
Metadata
Fields
Template:
Meeting
Date
7/7/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
64177
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7i. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in <br />cubic yards that will be used, and how and where it will be placed into the wetland. lhel <br />NA <br />7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in <br />cubic yards you will remove, and where the material will be disposed. h[A] <br />NA <br />Part 8—Waterbodies (other than wetlands): Impacts and Mitigation <br />In Part 8, "waterbodies" refers to non -wetland waterbodies. (See Part 7 for information related to wetlands.) el <br />2 Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.) <br />8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment. <br />D910 <br />❑ Not applicable <br />system ot excavated irrigation ditches (nonwetland waters) Is located on the project site and one irrigated I c Is <br />located just south of the project area. The field investigation delineated 11,860 lineal feet of ditches within the survey <br />area. Ditch 1 is likely considered jurisdictional because of the perennial flow. Ditches 2 and 4 are potentially jurisdictional <br />because they intersect another jurisdictional feature (wetlands W2 and W3, respectively, which are presumed <br />jurisdictional wetlands) Ditch 12 is potentially jurisdictional as it intersects ditch D1 and wetland W1, a presumed <br />juridictional feature. <br />Limited groundwater monitoring was performed on the site to determine general conditions. Periodic monitoring was <br />conducted throughout the 2019 irrigation season, beginning in early April 2019 before irrigation began in the valley, and <br />concluding in November 2019 after irrigation had been shut off for the season and groundwater levels had a chance to <br />stabilize. Ground water levels varied from an average 8 feet below ground level from mid-October through mid-March to <br />an average 1 foot below ground level during the irrigation season, from April to October. Site irrigation will be <br />discontinued once project construction begins. <br />8b. Will your project impact a waterbody or the area around a waterbody? bql t <br />2 Yes ❑ No <br />ORIA-revised 0212020 Page 8 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.