Laserfiche WebLink
8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland <br />waterbodies?hj elo <br />• If Yes, submit the plan with the JARPA package and answer 8d. <br />• If No, or Not applicable, explain below why a mitigation plan should not be required. <br />2 Yes ❑ No ❑ Don't know <br />8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was <br />used to design the plan. <br />• If you already completed 7g you do not need to restate your answer here. hf elpl <br />The primary function of all ditches on site is flow conveyance. The mitigation plan is intended to replace <br />this function lost through fill of ditches D1, D2, and D4 by relocating flow from these ditches to a new <br />ditch to be constructed along the northern and eastern perimeter of the site. The plan also includes <br />planting of riparian vegetation adjacent to the replacement ditch, thereby increasing habitat value of <br />this waterway. Ditch D12 will be relocated to the north of the southern property boundary. The <br />relocated ditches will replace lost functions at a ratio of at least 1:1. <br />8e. Summarize impact(s) to each waterbody in the table below.hf elpl <br />Activity (clear, <br />Waterbody <br />Impact <br />Duration <br />Amount of material <br />Area (sq. ft. or <br />dredge, fill, pile <br />name' <br />location <br />of impact3 <br />(cubic yards) to be <br />linear ft.) of <br />drive, etc.) <br />placed in or removed <br />waterbody <br />from waterbody <br />directly affected <br />Fill <br />Ditch D1 <br />In <br />Permanent <br />2,460 cy <br />47,000 sf <br />Fill <br />Ditch D2 <br />In <br />Permanent <br />490 cy <br />3,000 sf <br />Fill <br />Ditch D4 <br />In <br />Permanent <br />345 cy <br />5,100 sf <br />Fill <br />Ditch D12 <br />In <br />Permanent <br />1,750 cy <br />10,000 sf <br />If no official name for the waterbody exists, create a unique name (such as "Stream 1 ") The name should be consistent with other documents <br />provided. <br />2Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent, provide the distance between the impact and the waterbody and <br />indicate whether the impact will occur within the 100-year flood plain. <br />3Indicate the days, months or years the waterbody will be measurably impacted by the work. Enter "permanent" if applicable. <br />8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards) <br />you will use, and how and where it will be placed into the waterbody. gji <br />5,045 cubic yards of clean fill material will be placed into the existing channels of ditches D1, D2, D4, <br />and D12. Fill material will consist of structural fill obtained from locally sourced quarries. Placement <br />of fill material will be accomplished utilizing typical earthmoving equipment that may include <br />hydraulic excavators, scrapers, dump trucks, and compactors. <br />ORIA-revised 0212020 Page 9 of 14 <br />