My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-09-minutes-solid-waste-and-maintenance
>
Meetings
>
2020
>
07. July
>
2020-07-07 10:00 AM - Commissioners' Agenda
>
2020-06-09-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2020 3:03:02 PM
Creation date
7/2/2020 3:01:43 PM
Metadata
Fields
Template:
Meeting
Date
7/7/2020
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
64177
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7d. Has a wetland delineation report been prepared? Lel <br />• If Yes, submit the report, including data sheets, with the JARPA package. <br />2 Yes ❑ No <br />7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating <br />System?hj eM <br />• If Yes, submit the wetland rating forms and figures with the JARPA package.. <br />2 Yes ❑ No ❑ Don't know <br />7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands?hie <br />• If Yes, submit the plan with the JARPA package and answer 7g. <br />• If No, or Not applicable, explain below why a mitigation plan should not be required. <br />❑ Yes 2 No ❑ Don't know <br />The project will not impact wetlands, therefore no wetland mitigation is proposed. <br />7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was <br />used to design the plan.h[ gl p <br />NA <br />7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the <br />impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a <br />similar table, you can state (below) where we can find this information in the plan.hl�el <br />Activity (fill, <br />Wetland <br />Wetland <br />Impact <br />Duration <br />Proposed <br />Wetland <br />drain, excavate, <br />Name' <br />type and <br />area (sq. <br />of impact3 <br />mitigation <br />mitigation area <br />flood, etc.) <br />rating <br />ft. or <br />type4 <br />(sq. ft. or <br />category2 <br />Acres) <br />acres) <br />NA <br />If no official name for the wetland exists, create a unique name (such as "Wetland 1"). The name should be consistent with other project documents, <br />such as a wetland delineation report. <br />2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System. Provide the wetland rating forms <br />with the JARPA package. <br />3Indicate the days, months or years the wetland will be measurably impacted by the activity. Enter "permanent" if applicable. <br />^ Creation (C), Re-establishment/Rehabilitation (R), Enhancement (E), Preservation (P), Mitigation Bank/In-lieu fee B <br />Page number(s) for similar information in the mitigation plan, if available: <br />ORIA-revised 0212020 Page 7 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.