Laserfiche WebLink
November 28, 2018 <br />Jacobs Engineering <br />JE <br />BIG BOULDER CREEK BRIDGE <br />Env. Group <br />Env. <br />PrOect <br />Permit <br />Sr. <br />Cultural <br />Field <br />Em. <br />Engineer <br />Biologist <br />Technical <br />Admin <br />REPLACEMENT <br />Lead <br />Men3:r <br />Lead <br />Cultural <br />Tech <br />Jr <br />Editor <br />Item <br />SCOPE OF WORK <br />$162.07 <br />$117.18 <br />1582.811$186.521 <br />$68.60 1 <br />$82.39 <br />1 $82.81 <br />$111.60 <br />1$61.2511 <br />1 <br />PROJECT MANAGEMENT <br />Labor Subtotal: <br />0 1 <br />a <br />0 <br />a <br />0 1 <br />0 <br />0 <br />0 <br />0 <br />$0 <br />2 <br />5TRUCTURAL ENGINEERING <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />a <br />o <br />$0 <br />GE CO ETGE CO ETHNICAL ENGINEERING <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />a <br />1 o <br />0 <br />- 0 <br />a <br />0 <br />So <br />4 <br />HYDRAULIC ENGINEERING <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />0---:L-0 - <br />o <br />a <br />0 <br />0 <br />$a <br />ENVIRONMENTAL DOCUMENTATION & <br />5 <br />PERMITTING <br />5.10 <br />oject Management <br />2 <br />14 <br />4 <br />$2,210 <br />5.20 <br />GencyCoordination <br />3 <br />5 <br />$1.072 <br />5.30 <br />PAISEPA Documentation <br />1 <br />5 <br />30 <br />$3,232 <br />5.40 <br />191ologicall Assessment <br />40 <br />20 <br />96 <br />5 <br />$17,334 <br />5.50 <br />NHPA Section 106 Evaluation <br />1 <br />4 <br />2 <br />50 <br />2 <br />$4,657 <br />5.80 <br />JARPA Package Preparation and Submittal <br />1 <br />5 <br />40 <br />10 <br />5 <br />2 <br />$5,522 <br />5.70 <br />Local Permits and Approvals <br />1 <br />3 <br />16 <br />$1,839 <br />5.80 <br />Biology Support During Construction (Optional) <br />2 <br />40 <br />$3,547 <br />Labor Subtotal: <br />49 <br />58 <br />88 <br />2 <br />60 <br />10 <br />141 <br />9 <br />4 <br />$39,412 <br />�y1T <br />—J <br />$705 <br />6 <br />CIVIL ENGINEERING <br />r <br />Labor Subtotal: <br />C <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />$o <br />Le bo ka-- mi: <br />49 <br />$S <br />85 <br />j L <br />7u <br />t3 <br />_ 141 J 4 y0,2,7 'r 12 <br />Riaimbumable Sum: <br />$7d' <br />kpff Page 4 of 4 <br />