Laserfiche WebLink
Exhibit E-1 <br />Jacobs Engineering <br />Consultant Fee Summary <br />Negotiated Hourly Rate Consultant Agreement <br />BIG BOULDER CREEK BRIDGE REPLACEMENT <br />Overhead (OH) Cost <br />Fixed Fee (FF) <br />Classification <br />Env. Group Lead <br />Env. Project Manager <br />Permit Lead <br />Sr. Cultural <br />Cultural Field Tech <br />Env Engineer Jr <br />Biologist <br />Technical Editor <br />Administration <br />Reimbursables <br />Mileage <br />Airfare <br />Per Diem <br />Subcontract <br />(Blank) <br />Subtotal <br />117.00% <br />28.00% <br />Direct Hourly Total X Negotiated = Cost <br />Rate Hours Hourly Rate <br />$ <br />6615 <br />49.00 <br />X <br />$162.07 = <br />$ <br />7,941.31 <br />$ <br />47.83 <br />58.00 <br />X <br />$117.18 = <br />$ <br />6,796.64 <br />$ <br />33.80 <br />86.00 <br />X <br />$82.81 = <br />$ <br />7,121.66 <br />$ <br />76.13 <br />2.00 <br />X <br />$186.52 = <br />$ <br />373.04 <br />$ <br />2800 <br />50.00 <br />X <br />$68.60 = <br />$ <br />3,430.00 <br />$ <br />3363 <br />10.00 <br />X <br />$82.39 = <br />$ <br />823.94 <br />$ <br />33.80 <br />141.00 <br />X <br />$82.81 = <br />$ <br />11,676.21 <br />$ <br />45.55 <br />9.00 <br />X <br />$111.60 = <br />$ <br />1,004.38 <br />$ <br />25.00 <br />4.00 <br />X <br />$61.25 = <br />$ <br />245.00 <br />Subtotal <br />$ <br />39,412.17 <br />(500 Miles x $0.545/mile) $ 272 50 <br />(Allowance) $ <br />(Hotel + Meals @ $144/day x 3days) $ 432.00 <br />(Sub Name & Task) $ - <br />(Allowance) $ <br />$ 704.50 <br />GRAND TOTAL: $40,11 <br />