My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-10-minutes-public-works-study-session
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
2018-12-10-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:13:51 PM
Creation date
5/12/2020 2:10:34 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
50104
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 28, 2018 <br />Watershed Science & Engineering <br />vvst <br />BIG BOULDER CREEK BRIDGE REPLACEMENT <br />Principal <br />Senior <br />Engineer 1 <br />Junior Contract <br />Engineer Administrator <br />Item I SCOPE OF WORK <br />$212.99 <br />$188.66 <br />$97.37 1 <br />$94.93 <br />1 PROJECT MANAGEMENT <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />0 <br />$0 <br />2 STRUCTURAL E" kIWEERING <br />Labor Subtotal: <br />a <br />0 <br />0 77 <br />o <br />S0 <br />"'e (GEOTECHNICAL ENGINEERING <br />Labor Subtotal: <br />0 <br />a <br />0 <br />0 <br />$0 <br />4 HYDRAULIC ENGINEERING <br />4.10 Data Collection and Review <br />2 <br />8 <br />$1,205 <br />4.20 ISite Inspection <br />8 <br />8 1 <br />$2,483 <br />4.30 Channel Survey <br />2 <br />4 <br />$815 <br />4.40 Hydrology <br />z <br />4 <br />$e1S <br />4.50 Hydraulic Anaiysis <br />2 <br />1 <br />20 <br />$2,562 <br />4.60 Channel Stability and Scour Assessment <br />10 <br />16 <br />$3,688 <br />4.70 . WDFW and Permit Coordination <br />12 <br />4 <br />$2,845 <br />4.60 Hydraulic Investigation Report <br />20 <br />4 <br />16 <br />$6'572 <br />4.90 Meetings & Administration <br />10 <br />3 <br />2 <br />$2.612 <br />4.10 <br />E <br />Labor Subtotal: <br />68 <br />5 <br />183 <br />2 1E <br />$23,698 <br />$218 <br />ENVIRONMENTAL DOCUMENTATION & <br />5 <br />PERMITTING <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />0 <br />$0 <br />6 CIVIL ENGINEERING <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />0 <br />5a <br />Labor Sum: 68 S 83 Z $23,698 <br />Reimbursable Sum: $218 <br />kpff Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.