Laserfiche WebLink
KITTITgB CO <br />DEPARTMENT OF PUBLIC WORKS <br />KITTITA3 COUNTY <br />• If the level of effort and cost for permit or approval acquisition is higher than the budget <br />amount, Jacobs will coordinate with KPFF and the County to determine amendments as <br />needed. <br />• No mitigation planning is included in this scope of work. <br />TASK 6 CIVIIJROADWAY ENGINEERING <br />KPFF will provide civil engineering support for the replacement of Big Boulder Creek Bridge. <br />Civil design criteria will be Kittitas County Code Chapter 12- Roads and Bridge Standards and <br />as supplemented by the WSDOT Design Manual or AASHTO's Policy on Geometric Design of <br />Highway and Streets. <br />TASK 6.1— Civil Project Management <br />• Attend six (6) progress meetings via teleconference. <br />• Prepare invoice progress reports <br />TASK 6.2 — Development of PS&E/Contract Bid Documents <br />Plan Preparation for 30%, 75%, 100% draft, 100% Ad <br />6 Site Preparation <br />• Roadway plan and profile <br />• Typical sections and details <br />• Detour plan, profile and typical section <br />• Full Closure Signage Plan <br />Supporting Work. <br />• Civil stream grading for stream bypass. <br />• Prepare Stormwater Site plan and Construction Stormwater Pollution Prevention <br />Civil Special Provisions <br />• Provide WSDOT run list format civil technical special provisions <br />Civil Cost Estimate <br />• Provide quantities and unit prices for civil elements of work <br />TASK 6.3 — Quality Control Checks and Reviews <br />KPFF senior civil engineering staff will QC all civil design deliverables. <br />