My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-10-minutes-public-works-study-session
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
2018-12-10-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:13:51 PM
Creation date
5/12/2020 2:10:34 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
50104
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCX�DES ... TO TyECOC <br />KITTITAS COUNTY <br />XKXWWXTg4S CO <br />DEPARTMENT OF PUBLIC WORKS <br />c. Provide ongoing coordination with agencies throughout the review/approval <br />process. <br />TASK 5.50 — NHPA Section 106 <br />1. NHPA Section 106 Evaluation <br />a. Develop Area of Potential Effects (APE) and coordinate with SHPO. <br />b. Evaluate cultural and historic resources within the project area of effect as per <br />Section 106 requirements. <br />TASK 5.60 — JARPA Package Preparation and Submittal <br />1. JARPA Preparation and Submittal <br />a. Populate and submit one (1) DARPA application package. <br />b. Coordination with federal and/or state agencies for the following permits: <br />i. Corps 404 permit, United States Army Corps of Engineers (Assumes <br />Nationwide Permit) <br />ii. Hydraulic Permit Approval (HPA), WA State Dept. of Fish & Wildlife <br />iii. Ecology 401 permit review including development of TESC and SWPPP. <br />TASK 5.70 — Local Permits or Approvals <br />1. Local Permits or Exemptions <br />a. Coordinate with Kittitas County CDS on SEPA, Shorelines, and Critical Areas <br />requirements. <br />TASK 5.80 — Biology Support During Construction (OPTIONAL) <br />1. Support services during construction, including worksite isolation support, fish salvage <br />and removal, planting or site stabilization guidance up to 40 hours. This task is not <br />subject to Assumption la. <br />Assumptions: <br />• Coordination with FHWA or WSDOT Local Programs will not be required. <br />• The Biological Assessment that will be prepared will be "Likely to Adversely Affect" for <br />Bull Trout and Steelhead, and will require formal consultation with both USFWS and <br />NMFS. <br />• The US Army Corps of Engineers will issue a CWA Section 404 NWP 14. No individual <br />permit will be required. <br />• Section 106 will be determined as "May Affect", and will require SHPO concurrence <br />• The Department of Ecology will issue a Letter of Verification for CWA Section 402. No <br />individual permit will be required. <br />• No wetlands will be impacted by the project. This Scope does not include wetland <br />delineations or reporting. <br />• No NPDES Permit will be required. <br />• SEPA will be exempt. <br />
The URL can be used to link to this page
Your browser does not support the video tag.