My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-22-minutes-public-works-study-session
>
Meetings
>
2018
>
11. November
>
2018-11-06 10:00 AM - Commissioners' Agenda
>
2017-05-22-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:10:01 PM
Creation date
5/12/2020 2:06:51 PM
Metadata
Fields
Template:
Meeting
Date
11/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
49048
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eight safety improvement priorities where identified and are summarized as follows: <br />1. Roadside Hazard Safety Improvements — This is a County wide spot safety <br />improvement project to fix known high risk hazard locations on multiple <br />roadways. <br />2. Bridge Rail Code 3 (Phase 1 through Phase 3) — This is three separate <br />construction projects to improve bridges that have no safety rail or wooden traffic <br />rail. <br />3. Clear Zone Inventory — Data Collection — This is a planning effort to identify <br />hazards County wide. <br />4. Denmark Road - Project to improve safety hazards on said road. <br />S. Huntzinger Road (Phase 1 through Phase 3) — This is three separate construction <br />projects to continue guardrail along Huntzinger Road. <br />6. Bridge Rail Code 2 (Phase 1 through Phase 7) — This is seven separate <br />construction projects to improve bridges that have no approach rail, or non- <br />crashworthy Tall. <br />7. Bridge Rail Code 1 - This improves bridges that have no approach rail. <br />S. Corridor and Intersection Safety Improvements — Monitors several locations that <br />have accidents but we have recently improved. So we will watch to see if the <br />accidents are reduced and decide if these locations should be fiarther evaluated <br />and improved or removed from future plans. <br />FISCAL IMPACTS: <br />The data gathering, engineering analysis, project scoping, cost estimating, and plan <br />narrative is being delivered internally by the Public Works engineering staff. To date <br />about $27,000 has been expensed. It is anticipated that the plan will be delivered <br />approximately well under the budgeted $54,000 grant. <br />ATTACbIIV=S: <br />Final Kittitas County Road Safety Plan 2017 <br />Page 2 of 2 <br />PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.