My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-13-minutes-public-works-study-session
>
Meetings
>
2018
>
08. August
>
2018-08-21 10:00 AM - Commissioners' Agenda
>
2018-08-13-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:04:12 PM
Creation date
5/12/2020 2:02:28 PM
Metadata
Fields
Template:
Meeting
Date
8/21/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
47235
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency <br />Project Title <br />Date <br />Kittitas County Public Works <br />University Way and Reecer Creek Rd -Inter <br />8/8/18 <br />Right of Way <br />❑✓ No Right of Way Needed <br />❑ Right of Way Needed <br />* All construction required by the <br />❑ No Relocation ❑ Relocation Required <br />contract can be accomplished <br />within the exiting right of way. <br />Utilities <br />Railroad <br />❑ No utility work required <br />❑✓ No railroad work required <br />❑✓ All utility work will be completed prior to the start <br />❑ All railroad work will be completed prior to the start of <br />of the construction contract <br />the construction contract <br />[-]All utility work will be completed in coordination <br />E] All the railroad work will be completed in coordination <br />with the construction contract <br />with the construction contract <br />Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project <br />Utility conflicts will be identified during the PE phase of the project, and utility relocation will be coordinated <br />before construction begins. <br />FAA Involvement <br />Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ❑✓ No <br />Remarks <br />Bowers Field airport aeronautical area is located slightly over 2 miles from the project location. Industrial <br />land area within the airport property falls within the 2 mile radius from the project site, but there is no <br />aeronautical activity within this area. <br />This project has been reviewed by the legislative body of the administration agency or agencies, or it' <br />designee, and is not inconsistent with the agency's comprehensive plan for corpmunity development. <br />Ag/ <br />Date By <br />DOT Form 140-101 Page 3 <br />Revised 04/2015 Previous Editions Obsolete <br />
The URL can be used to link to this page
Your browser does not support the video tag.