Laserfiche WebLink
Agency <br />Project Title <br />Date <br />Kittitas County Public Works <br />University <br />Way and Reecer Creek Rd - <br />Inter: <br />8/8/18 <br />Type of Proposed Work <br />Project Type (Check all that Apply) <br />Roadway Width <br />Number of Lanes <br />❑ New Construction ❑ Path / Trail <br />❑ 3-R <br />40 <br />2 <br />❑✓ Reconstruction ❑ Pedestrian / Facilities <br />❑ 2-R <br />❑ Railroad ❑ Parking <br />❑✓ Other <br />❑ Bridge <br />Geometric Design Data <br />Description <br />Through Route <br />Crossroad <br />❑✓ Principal Arterial <br />❑ Principal Arterial <br />Federal❑✓ <br />Urban <br />Minor Arterial <br />El Minor <br />Urban <br />❑ Minor Arterial <br />Functional <br />E:1Rural <br />ElCollector <br />❑ Rural <br />❑ Collector <br />Classification <br />❑ NHS <br />❑ Major Collector <br />❑ NHS <br />Major Collector <br />❑ Minor Collector <br />❑ Minor Collector <br />❑ Local Access <br />❑ Local Access <br />Terrain <br />❑✓ Flat ❑ Roll ❑ Mountain <br />❑✓ Flat ❑ Roll ❑ Mountain <br />Posted Speed <br />40 <br />35 <br />Design Speed <br />40 <br />35 <br />Existing ADT <br />8,771 <br />4,419 <br />Design Year ADT <br />13,033 <br />6,566 <br />Design Year <br />2,038 <br />2,038 <br />Design Hourly Volume (DHV) <br />1,479 <br />211 <br />Performance of Work <br />Preliminary Engineering Will Be Performed By <br />Others <br />Agency <br />City of Ellensburg (through Interlocal Agreement) / Consultant <br />100 % <br />0 <br />Construction Will Be Performed By <br />Contract <br />Agency <br />Contractor <br />100 % <br />0 % <br />Environmental Classification <br />❑ Class I - Environmental Impact Statement (EIS) <br />0✓ Class II - Categorically Excluded (CE) <br />❑ Project Involves NEPA/SEPA Section 404 <br />❑✓ Projects Requiring Documentation <br />Interagency Agreement <br />(Documented CE) <br />❑ Class III - Environmental Assessment (EA) <br />❑ Project Involves NEPA/SEPA Section 404 <br />Interagency Agreements <br />Environmental Considerations <br />Environmental permitting needs will be identified during the PE phase, and any required permits will be acquired during that phase. <br />It is anticipated that NEPA will be the only permit required. <br />uui rorm 14u-1 u1 Page 2 <br />Revised 04/2015 Previous Editions Obsolete <br />