Laserfiche WebLink
5. Map or table showing the volume -to -capacity ratio and LOS for each arterial road <br />segments. The County will provide a map of roadway capacity which includes any <br />committed projects to be completed within the next six years. <br />List of any roadway segments where the LOS exceeds the standard creating a concurrency <br />deficiency. <br />J. Summary of Project Conditions with Mitigation. <br />1. Identification of proposed frontage improvements, and proposed connections to planned <br />bicycle and pedestrian facilities. <br />2. Identification of proposed mitigation at site access points required to meet County <br />intersection LOS requirements during the PM (and other) peak hours. <br />3. Identification of mitigation at identified concurrency intersections required to meet County <br />roadway LOS requirements. <br />4. Identification of mitigation measures at study non -concurrency intersections required to <br />meet County LOS requirements during the PM (and other) peak hours. <br />5. Supporting analysis to justify improvements such as warrant analysis for signals, turn lanes, <br />or other improvements. <br />6. Summary table of peak hour levels of service with applied mitigation measures. <br />7. Planning level cost estimates for proposed mitigation. <br />8. Proportionate share calculation for mitigation measures at non -concurrency intersection <br />based on the percentage ratio of development trips to total trips during the PM (and other) <br />peak hours. <br />K. Appendix. <br />1. Explanation of analysis methods used in the transportation impact analysis. <br />2. Raw turn data movement counts. <br />3. Level of service calculation worksheets. <br />4. Other information provided. <br />12.04.02.070 Transportation Impact Analysis Review and Acceptance. <br />At the same time as the submission of an application for proposed development, the applicant shall <br />submit the applicant's transportation impact analysis to the County Engineer or designee. <br />The County Engineer or designee shall review each transportation impact analysis for accuracy and <br />conformity with the criteria set forth in this title. Within twenty-eight calendar days of the submission of <br />the transportation impact analysis, the County Engineer or designee shall make a determination of <br />completeness of the submittal. <br />Title 12 Kittitas County Code I Draft No. 5 — Working Draft forAdoption 6/12/2018 <br />33 <br />