My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-25-minutes-public-works-study-session
>
Meetings
>
2018
>
07. July
>
2018-07-17 10:00 AM - Commissioners' Agenda
>
2018-06-25-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:04:54 PM
Creation date
5/12/2020 2:00:53 PM
Metadata
Fields
Template:
Meeting
Date
7/17/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
46299
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Required Notice: Two working day notice. Inspection must be complete prior to pouring <br />concrete. <br />2. Inspection Details: To verify proper forming and preparation for concrete in accordance <br />with the approved plans, and these standards. If the scope of the project is such that <br />forming of curb and sidewalk is completed in stages, each such stage shall be inspected <br />separately. <br />N. Curb and Sidewalk Placement: <br />1. Required Notice: Two working day notice. <br />2. Inspection Details: To check placement of concrete in accordance with the approved <br />plans, and these standards. <br />I Pre -Paving: <br />1. Required Notice: Two working day notice. <br />2. Inspection Details: Prior to paving, to verify that all work to date has been constructed in <br />accordance with the approved plans, and these standards. <br />J. Paving: <br />1. Required Notice: Three working day notice in advance of paving with hot mix asphalt or <br />Portland cement concrete. <br />2. Inspection Details: To verify paving and compaction, or placement of concrete roadway is <br />in accordance with the approved plans, and these standards. <br />K. Structural: <br />1. Required Notice: Three working day notice prior to each of critical stages such as placing <br />foundation piling or footings, placement and assembly of major components, and <br />completion of structure and approaches. <br />2. Inspection Details: Tests and certification requirements will be as directed by the County <br />Engineer. <br />L. Final Inspection: <br />1. Required Notice: Five working day notice. <br />2. Inspection Details: Overall check of project site, to verify completion of paving and <br />associated appurtenances and improvements, traffic control devices, electrical systems, <br />utility installation, cleaning of drainage system, edge restoration, seeding, planting, and all <br />necessary clean-up in accordance with the approved plans and these standards. <br />3. Additional Requirements: Prior to final approval of construction work, acceptance for <br />maintenance and release of construction performance bonds, the developer/contractor <br />shall pay any required fees, submit any required maintenance and defect financial <br />Title 12 Kittitas County Code I Draft No. 5 — Working Draft for Adoption 6/12/2018 <br />98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.