My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-25-minutes-public-works-study-session
>
Meetings
>
2018
>
07. July
>
2018-07-17 10:00 AM - Commissioners' Agenda
>
2018-06-25-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:04:54 PM
Creation date
5/12/2020 2:00:53 PM
Metadata
Fields
Template:
Meeting
Date
7/17/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
46299
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
guarantees, provide certification of monumentation and submit one myiar set of <br />corrected plans (as -built) reflecting all minor and design plan changes of the roadway and <br />drainage systems. The Department of Public Works shall specify the number of mylar sets <br />as warranted by the type of improvement. Mylars shall not have any shading or adhesive <br />addition in any areas. If original plans were completed on a CADD system, the <br />developer/contractor shall submit, in addition to mylars, :+ copy of the CADD drawing files <br />in .DWG format. <br />M. Final Maintenance Inspection: <br />1. Required Notice: 30 days prior to the end of the maintenance period. <br />2. Inspection Details: Overall check of work associated with a maintenance guarantee. <br />3. Additional Requirements: Prior to release of the maintenance guarantee, there shall be <br />successful completion of the maintenance period as described KCC 12.01.090, repair of <br />any failed facilities and the payment of any outstanding fees. <br />12.05.02.080 Structure Inspections. <br />The following shall apply to the construction inspection of all bridges and major drainage structures: <br />A. All materials and construction activity, and testing thereof, shall conform to the current edition of <br />the WSDOT Standard Specifications, as amended. <br />B. Prior to construction, the County Engineer shall hold a pre -construction meeting with the <br />applicant's structural engineer to review the required inspections and documentation. <br />C. The applicant's structural engineer shall be responsible for inspection, material testing, quality <br />control, and sufficiency of the completed structure. <br />D. All inspection activities and methods shall be subject to approval by the County Engineer. <br />E. Inspection and testing shall be conducted at the direction of the applicant's structural engineer as <br />frequently as necessary to ensure the construction conforms to the approved plans and <br />specifications. <br />F. A complete written report of all inspections and testing shall be furnished to the County Engineer <br />for approval at completion of the structure. The report shall include all complete log of all <br />inspection and testing activities including all data, calculations, and documentation. <br />G. The county, or the county's consultant, may perform independent inspections and testing at any <br />time during construction. <br />Title 12 Kittitas County Code ' Draft No. 5 — Working Draft forAdoption 6/12/2018 <br />99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.