Laserfiche WebLink
guarantees, provide certification of monumentation and submit one myiar set of <br />corrected plans (as -built) reflecting all minor and design plan changes of the roadway and <br />drainage systems. The Department of Public Works shall specify the number of mylar sets <br />as warranted by the type of improvement. Mylars shall not have any shading or adhesive <br />addition in any areas. If original plans were completed on a CADD system, the <br />developer/contractor shall submit, in addition to mylars, :+ copy of the CADD drawing files <br />in .DWG format. <br />M. Final Maintenance Inspection: <br />1. Required Notice: 30 days prior to the end of the maintenance period. <br />2. Inspection Details: Overall check of work associated with a maintenance guarantee. <br />3. Additional Requirements: Prior to release of the maintenance guarantee, there shall be <br />successful completion of the maintenance period as described KCC 12.01.090, repair of <br />any failed facilities and the payment of any outstanding fees. <br />12.05.02.080 Structure Inspections. <br />The following shall apply to the construction inspection of all bridges and major drainage structures: <br />A. All materials and construction activity, and testing thereof, shall conform to the current edition of <br />the WSDOT Standard Specifications, as amended. <br />B. Prior to construction, the County Engineer shall hold a pre -construction meeting with the <br />applicant's structural engineer to review the required inspections and documentation. <br />C. The applicant's structural engineer shall be responsible for inspection, material testing, quality <br />control, and sufficiency of the completed structure. <br />D. All inspection activities and methods shall be subject to approval by the County Engineer. <br />E. Inspection and testing shall be conducted at the direction of the applicant's structural engineer as <br />frequently as necessary to ensure the construction conforms to the approved plans and <br />specifications. <br />F. A complete written report of all inspections and testing shall be furnished to the County Engineer <br />for approval at completion of the structure. The report shall include all complete log of all <br />inspection and testing activities including all data, calculations, and documentation. <br />G. The county, or the county's consultant, may perform independent inspections and testing at any <br />time during construction. <br />Title 12 Kittitas County Code ' Draft No. 5 — Working Draft forAdoption 6/12/2018 <br />99 <br />