My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-25-minutes-public-works-study-session
>
Meetings
>
2018
>
07. July
>
2018-07-17 10:00 AM - Commissioners' Agenda
>
2018-06-25-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:04:54 PM
Creation date
5/12/2020 2:00:53 PM
Metadata
Fields
Template:
Meeting
Date
7/17/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
46299
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Inspection Details: To verify that temporary sedimentation and erosion control has been <br />installed in accordance with approved plans and these standards. Subsequent inspections <br />may be required at the discretion of the County Engineer as necessary to ensure <br />continued proper operation and maintenance of temporary sedimentation and erosion <br />control for the duration of construction. <br />C. Utility and Storm Drainage Installation: <br />1. Required Notice: Two working day notice prior to trenching and placing of storm <br />drainage systems. <br />2. Inspection Details: To verify that underground storm drainage facilities, including but not <br />limited to pipes, catch basins, and manholes have been constructed in accordance with <br />the approved plans and these standards. Inspection shall take place prior to backfill. If <br />cover is installed in stages, multiple inspections shall be scheduled as necessary to ensure <br />that all facilities receive inspection. <br />D. Utility and Storm -Drainage Backfill and Compaction: <br />1. Required Notice: Two working day notice before backfill and compaction of storm <br />drainage systems. <br />2. Inspection Details: Verify that backfill for all trenching within the roadway, existing right of <br />way, and future right of way is in compliance with the approved plans and these <br />standards. <br />E. Subgrade Completion: <br />1. Required Notice: Two working day notice at stage that underground utilities and roadway <br />grading are complete. <br />2. Inspection Details: To verify that the subgrade has been constructed and graded in <br />compliance with the approved plans and these standards. If the subgrade and surfacing is <br />installed in stages, multiple inspections shall be scheduled as necessary to ensure that all <br />subgrade has been inspected. <br />F Crushed Surfacing Placement: <br />1. Required Notice: Two working day notice. <br />2. Inspection Details: To verify that crushed surfacing has been placed and compacted in <br />accordance with the approved plans, and these standards. If the scope of the project is <br />such that the crushed surfacing is completed in stages, each such stage shall be inspected <br />separately. <br />G. Curb and Sidewalk Forming: <br />Title 12 Kittitas County Code I Draft No. 5— Working Draft forAdoption 6/12/2018 <br />97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.