My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-24-minutes-public-works-study-session
>
Meetings
>
2017
>
11. November
>
2017-11-07 10:00 AM - Commissioners' Agenda
>
2017-07-24-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:51:49 PM
Creation date
5/12/2020 1:49:39 PM
Metadata
Fields
Template:
Meeting
Date
11/7/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
40471
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Preliminary Planning 1 Engineering Phase: DONE see attached floor plans <br />Estimated Start Date: <br />Estimated End Date: <br />Please explain phase status (work already completed, in progress, awaiting funding, etc., and factors that <br />may slow phase progress). <br />4. Right of Way Phase: NIA <br />Estimated Start Date: <br />Is It Required? Yes No X <br />Estimated End Date: <br />Please explain prase status (work already completed, in progress, awaiting funding, etc., and factors that <br />may slow phase progress). <br />5. Construction Phase: <br />Estimated Start Date: April 1. 2017 Estimated End Date: June 1. 2017 <br />Please explain phase status (work already completed, in progress, awaiting funding, etc., and factors that <br />may slaw phase progress). <br />Currently the public works crew has removed all plumbing fixtures and stall partitions. We have obtained one <br />estimate for installing a new roof and skylights and one estimate to install the new fixtures and the rest of the work <br />outlined above. Because the bathroom roof is leaking the City does not want to do anything inside until the roof <br />gets replaced. The roof cannot get replaced until the snow leaves. Once the snow leaves, the roofer will replace <br />the roof and skylight (which currently is scheduled for the first of April but could change with the weather) and <br />another contractor will finished the work immediately afterwards. <br />6. Indicate if the project is consistent with the following applicable state, regional and local plans and <br />prioritization processes: <br />❑ overall Economic Development Plan — Officially Adopted <br />Comprehensive Land Use Plan — Officially Adopted 2009 <br />o Capitai Facility Plan — Officially Adopted 2008 <br />O Community Action Plan (or other community-based plan) — Officially Adopted 1998 2007 <br />Ci Six -Year Transportation Improvement Pian — Officially Adopted 2015 <br />Site-specific development plans; e.g., Community Waster Plan — Officially Adopted 1997 2012 <br />