My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-13-minutes-public-works-study-session
>
Meetings
>
2017
>
04. April
>
2017-04-04 10:00 AM - Commissioners' Agenda
>
2017-03-13-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:46:58 PM
Creation date
5/12/2020 1:44:45 PM
Metadata
Fields
Template:
Meeting
Date
4/4/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
35739
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SI'319VX ASM CaTJ1tTZ`Y <br />ri DEPARTMENT OF PUBLIC WORKS <br />a Project kick off/ Plan Goals/Identify missing data <br />o County transportation issues/county roads tow <br />a Level of Service Policies <br />o Project List <br />o County funding priorities <br />Facilitate transportation goals & policies version of April 6, 2017 Comprehensive Plan working <br />group meeting <br />Consultant will provide materials for placement on the county's website or to include in other <br />local media, including the newspaper. <br />Attend up to two Planning Commission or Board of County Commissioners meetings — consultant <br />will solicit input on desired improvements and funding priorities, as well as present on progress of <br />the plan development. <br />Deliverables: <br />• Attendance and participation in up to five staff workshops <br />• Facilitation of transportation goals & policies version of Comprehensive Plan working group <br />meeting <br />4 Project materials include project factsheet, and up to two newspaper or online articles. <br />Presentation and attendance at up to two PC/BOCC meetings. <br />See deliverables in Tasks 03-08. <br />Task 03 - Transportation Needs Assessment fExisting a d P • Fehr and Peers will use the results of <br />the public outreach task to determine whether the transportation issues identified in the previous <br />Transportation Element have changed. To the extent that many of the issues remain the same, the write <br />up and depiction ofpmvious issues will be incorporated into this element. Once the key transportation <br />issues are identified, Fehr and Peers will review federal, state, regional, and county <br />requirements/guidelines for guidance in how to address these issues. Fehr and Peers will use these <br />fundings to conduct a needs assessment for the following transportation modes, programs, and major <br />transportation corridors: <br />• Traffic volumes - Fehr and Peers will use the most recent available traffic count and model data <br />to depict traffic volumes on county collector and arterial roadways. <br />• Multimodal facilities — Fehr and Peers will summarize the presence of multimodal modal <br />facilities based on the published plans, such as the previous Transportation Element <br />• Freight and Track Mobility - Fehr and Peers will summarize the presence of freight mutes <br />based on published plans, such as the previous Transportation Element and WSDOT freight data <br />• Safety — Fehr and Peers will summarize collision information provided by WSDOT or the County <br />• Transportation Corridors — Fehr and Peers will compile a short list of staff identified <br />transportation corridors and rank their relative significance at the planning horizon (2037). <br />Page 2 <br />P.�YY3%765GC�100PRCON�IIRIOMIjWlk76606 &hAR_Am�nAnm[�W_I7 �-07VT d= <br />
The URL can be used to link to this page
Your browser does not support the video tag.