My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-25-minutes-public-works-study-session
>
Meetings
>
2017
>
02. February
>
2017-02-07 10:00 AM - Commissioners' Agenda
>
2016-04-25-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:42:59 PM
Creation date
5/12/2020 1:40:05 PM
Metadata
Fields
Template:
Meeting
Date
2/7/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
34676
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
design. <br />Elements of the conceptual design layout and evaluation will be presented at the charrette include <br />the following: <br />a. Plan and profile views of culvert replacement and roadway approach reconstruction. <br />b. Typical sections of culvert replacement and roadway approach reconstruction. <br />c. Conceptual construction staging and stream bypass maintaining on"Irectional traffic during <br />construction. <br />d. Conceptual details for upstream and downstream culvert walls, side slopes, and traffic barriers. <br />e. Conceptual details for culvert foundations_ <br />f. Technical memorandum summarizing results and recommendations of concept phase design, <br />and design feedback gained from the Owner resulting from the design charrette. <br />B. Deliverables <br />1. Concept plan -and profile -views. <br />2. Concept typical sections. <br />3. Concept construction staging and stream bypass. <br />4. Concept details (referenced above). <br />5. Technical summary memorandum. <br />6. Copies of any supporting environmental analysis or agency correspondence. <br />7. JARPA document and drawings <br />C. CONSULTANT's Services under this Phase will be complete on the date the Concept Phase <br />Documents and any other listed Deliverables have been submitted to the Owner. <br />2.04 Final Design Phase <br />A. Upon the Owner's approval of the Concept Phase, including any mutually -agreed modifications, the <br />CONSULTANT will advance the concept to final design level. CONSULTANT shall deliver the <br />preliminary design elements, plan sheets, and documents constituting the final design: <br />1. Existing topographic survey and alignment control plan. <br />2. Recommended traffic control and construction staging plan. <br />3. Proposed culvert and roadway approach plan/profile sheets). <br />4. Roadway approach typical sections. <br />5. Recommended stream bypass details. <br />6. Culvert wall and slope grading details. <br />Page 5 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.