My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-28-minutes-public-works-study-session
>
Meetings
>
2019
>
05. May
>
2019-05-07 10:00 AM - Commissioners' Agenda
>
2019-01-28-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 12:53:09 PM
Creation date
5/12/2020 12:50:20 PM
Metadata
Fields
Template:
Meeting
Date
5/7/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
53395
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 10, 2019 <br />KPFF Consulting Engineers <br />KPFF <br />Kittitas Count 2019 Bridge Inspections <br />County g <br />Principal <br />Technical <br />Specialist <br />Project <br />Manager <br />Senior <br />Engineer I <br />Design <br />Engineer <br />Projad <br />Coordinator <br />Multiplier <br />item <br />SCOPE OF WORK <br />$171.52 <br />$171.76 <br />$119.68 <br />$119.68 <br />$86.44 <br />$75.24 <br />1.0000 <br />1 <br />Management <br />1.00 <br />Management <br />1.10 <br />Contract Compliance <br />2 <br />2 <br />$582 <br />1.20 <br />Invoicing & Progress Summaries (12 months) <br />12 <br />12 <br />$2,351 <br />1.30 <br />Client Communication (phone, email) <br />24 <br />$2.672 <br />1.40 <br />Internal Project Coordination <br />2 <br />24 <br />53,215 <br />Labor Subtotal: <br />1 4 0 <br />62 0 <br />0 12 <br />$9,021 <br />Reimbursable: <br />2 <br />Travel to Ellensburg <br />2.00 <br />Travel to Ellensburg <br />2.10 <br />2.20 <br />February (one trip, two days) <br />April (one trip, one day) two person crew <br />3 <br />3 <br />3 <br />$359 <br />$674 <br />2.30 <br />June (one trip, one day) 3 person crew <br />3 <br />3 <br />3 <br />$1,134 <br />2.40 <br />September Trips (two trips, 5 days) <br />6 <br />5718 <br />2.50 <br />October Trips (two trips, 5 days) <br />6 <br />$718 <br />2.60 <br />November (two trips, 5 days) <br />6 <br />$718 <br />2.70 <br />December (one trip, 3 days) <br />3 <br />$369 <br />Labor Subtotal: <br />0 6 <br />0 30 <br />s o <br />$4,880 <br />Reimbursable: <br />$3,289 <br />3 <br />Kittitas County Inspection and Reports (156 <br />Bridges) <br />3.10 <br />February Bridges (2 inventory, 6 Short Span) <br />3.11 <br />Office Prep Work <br />4 <br />$479 <br />3.12 <br />Inventory Inspections <br />5 <br />_ _$_598_ <br />3.13 <br />Inventory Report Preparation <br />10 <br />$1,197 <br />3.14 <br />Short Span Inspections <br />6 <br />$718 <br />3.15 <br />Short Span Report Preparation <br />6 <br />$718 <br />3.16 <br />QC Review of Reports4 <br />$687_ <br />3.17 <br />Draft and Final Signed Submittals <br />4 <br />_ $479 <br />3.20 <br />April Bridges (1 FC & 1 Routine Steel) <br />3.21 <br />Office Prep Work <br />1 <br />4 <br />3.22 <br />Routine/Fracture Critical Inspections <br />a <br />a <br />_$650_ <br />$21332 <br />3.23 <br />Routine/Fracture Critical Report Preparation <br />12 <br />91 A36 <br />3.24 <br />QC Review of Reports <br />2 <br />$3_44 <br />3.25 <br />Draft and Final Signed Submittals <br />2 <br />$239 <br />3.30 <br />June Bridges (1 FC - Truss & 1 NBI Routine) <br />3.31 <br />Office Prep Work <br />2 <br />4 <br />4 <br />$1,169 <br />3,32 <br />Routine/Fracture Critical Inspections <br />8 <br />8 <br />8 <br />$3-023 <br />3.33 <br />Routine/Fracture Critical Report Preparation <br />20 <br />$2394 <br />3.34 <br />QC Review of Reports <br />4 <br />$687 <br />3.35 <br />Draft and Final Signed Submittals <br />2 <br />$139 <br />3.40 <br />September Bridges (15 NBI, 13 Short Span) <br />3.41 <br />Office Prep Work <br />8 <br />_ <br />$957 <br />3.42 <br />Routine Inspections <br />28 <br />$3,351 <br />3.43 <br />Routine Report Preparation <br />24 <br />$2,872 <br />3.44 <br />Short Span Inspections <br />13 <br />$1556 <br />3.45 <br />Short Span Report Preparation <br />13 <br />$1,558 <br />3.46 <br />QC Review of Reports <br />6 <br />$1374 <br />3,47 <br />Draft and Final Signed Submittals <br />4 <br />$479 <br />3.50 <br />October Bridges (23 NBI, 13 Short Span) <br />3.51 <br />Office Prep Work <br />a <br />$957 <br />3.52 <br />Routine Inspections <br />30 <br />$3,590 <br />3.53 <br />Routine Report Preparation <br />38 <br />$4548 <br />3.54 <br />Short Span inspections <br />13 <br />$1 556 <br />
The URL can be used to link to this page
Your browser does not support the video tag.