Laserfiche WebLink
3.55 <br />Short Span Report Preparation <br />13 <br />$1,556 <br />3.56 <br />QC Review of Reports <br />10 <br />$1,715 <br />3.57 <br />Draft and Final Signed Submittals <br />4 <br />$479 <br />3.60 <br />November Bridges (22 NBI, 26 Short Span) <br />3.61 <br />Office Prep Work <br />12 <br />e1.436 <br />3.62 <br />Routine Inspections <br />24 <br />$2.672 <br />3.63 <br />Routine Report Preparation <br />36 <br />$4.308 <br />3.64 <br />Short Span Inspections <br />25 <br />$3,351 <br />3.65 <br />Short Span Report Preparation <br />28 <br />$3,351 <br />3.66 <br />QC Review of Reports <br />12 <br />$2,061 <br />3.67 <br />Draft and Final Signed Submittals <br />8 <br />$957 <br />3.70 <br />December Bridges (1 NBI, 29 Short Span) <br />3.71 <br />Office Prep Work <br />V29 <br />8 <br />$957 <br />3.72 <br />Routine Inspections <br />1 <br />$120 <br />3.73 <br />Routine Report Preparation <br />2 <br />$239 <br />3.74 <br />Short Span Inspections <br />$3.471 <br />3.75 <br />Short Span Report Preparation <br />29 <br />$3.471 <br />3.76 <br />QC Review of Reports <br />8 <br />$1,374 <br />3.77 <br />Draft and Final Signed Submittals <br />4 <br />$479 <br />Labor Subtotal: 0 <br />67 <br />0 500 <br />12 <br />0 <br />$72,356 <br />Reimbursable <br />4 <br />City of Cie Elum Bridges <br />4.00 <br />City of Cie Elum Inspection and Reports (3 Bridges) <br />4.10 <br />Office Prep Work <br />2 <br />$23S <br />4.20 <br />Routine Inspections <br />4 <br />_ $479 <br />4.30 <br />Routine Report Preparation <br />6 <br />$718 <br />4.40 <br />QC Review of Reports <br />2 <br />$344_ <br />4.50 <br />Draft and Final Signed Submittals <br />2 <br />$239-- <br />239Labor <br />LaborSubtotal: 0 <br />2 <br />0 14 <br />0 <br />0 <br />$2,019 <br />Reimbursable: <br />6 <br />City of Ellensburg Bridges <br />5.00 <br />City of Ellensburg Inspection and Reports (6 Bridges) <br />_ <br />5.10 <br />Office Prep Work <br />4 <br />--S479 <br />5.20 <br />Routine Inspections <br />8 <br />$957-- <br />5,30 <br />Routine Report Preparation <br />12 <br />--.$1.43.6- <br />5.40 <br />QC Review of Reports <br />2 <br />_ __$344 <br />5.50 <br />Draft and Final Signed Submittals <br />2 <br />_$239 <br />5.60 <br />Roundtrip Travel <br />3 <br />_ $359 _ _ <br />Labor Subtotal: 0 <br />2 <br />0 29 <br />0 <br />0 <br />$3,814 <br />Reimbursable: <br />5 <br />City of Wttitas Bridges <br />5.00 <br />City of Kittitas Inspection and Reports (1 Bridge) <br />5.10 <br />Office Prep Work <br />1 <br />$60 <br />5.20 <br />Routine Inspections <br />1 <br />$124 <br />5.30 <br />Routine Report Preparation <br />1 <br />$120 <br />5.40 <br />QC Review of Reports <br />1 <br />_$172 <br />5.50 <br />Draft and Final Signed Submittals <br />1 <br />$120 <br />Labor Subtotal: 0 <br />1 <br />6 4 <br />0 <br />0 <br />$591 <br />Reimbursable <br />6 <br />Repair Summary List <br />6.00 <br />Repair Summary List <br />5.10 <br />Export repair list from WSBIS <br />4 <br />$479 <br />6.20 <br />Edit List/Assign priority ratings <br />6 <br />16 <br />4 <br />$9.291 <br />6.30 <br />Document Submittal <br />2 <br />$239 <br />Labor Subtotal: 0 <br />6 <br />0 22 <br />4 <br />0 <br />$4,009 <br />Reimbursable: <br />