Laserfiche WebLink
Exhibit D-1 <br />KPFF Consulting Engineers <br />Consultant Fee Summary <br />Negotiated Hourly Rate Consultant Agreement <br />Mttitas County 2099 Bridge Inspections <br />Overhead (OH) Cost 136.25% <br />Fixed Fee (FF) 28.00% <br />Classification Direct Hourly Total X Negotiated = Cost <br />Rate Hours Hourly Rate <br />Principal <br />$ <br />64.91 <br />4.00 <br />X <br />$171.52 <br />= $ <br />686.10 <br />Technical Specialist <br />$ <br />65.00 <br />88.00 <br />X <br />$171.76 <br />= $ <br />15,115.10 <br />Project Manager <br />$ <br />45.29 <br />62.00 <br />X <br />$119.68 <br />= $ <br />7,420.09 <br />Senior Engineer II <br />$ <br />54.00 <br />0.00 <br />X <br />$142.70 <br />= $ <br />- <br />Senior Engineer 1 <br />$ <br />45.29 <br />638.50 <br />X <br />$119.68 <br />= $ <br />76,414.93 <br />Project Engineer 11 <br />$ <br />43.27 <br />0.00 <br />X <br />$114.34 <br />= $ <br />- <br />Project Engineer 1 <br />$ <br />36.92 <br />0.00 <br />X <br />$97.56 <br />= $ <br />- <br />Design Engineer <br />$ <br />32.71 <br />19.00 <br />X <br />$86.44 <br />= $ <br />1,642.29 <br />Sr. CADD Technician <br />$ <br />45.75 <br />0.00 <br />X <br />$120.89 <br />= $ <br />- <br />CADD Technician <br />$ <br />42.63 <br />0.00 <br />X <br />$112.65 <br />= $ <br />- <br />Project Coordinator <br />$ <br />28.85 <br />22.00 <br />X <br />$76.24 <br />= $ <br />1,677.19 <br />Subtotal <br />$ 102,955.70 <br />Reimbursables <br />Mileage <br />(220 Miles x 10 trips x $0 545/mile) <br />$ <br />1,199.00 <br />Hotel <br />(11 nights, <br />$1001night) <br />$ <br />1100.00 <br />Per Diem <br />(18 days $55/day) <br />$ <br />990.00 <br />Subtotal <br />$ <br />3,289.00 <br />KPFF TOTAL: <br />$106,244.70 <br />SUBCONSULTANT TOTAL: $0.00 <br />TASK ORDER TOTAL: $106,244.7011 <br />