My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-10-minutes-public-works-study-session
>
Meetings
>
2019
>
06. June
>
2019-06-18 10:00 AM - Commissioners' Agenda
>
2019-06-10-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 12:40:47 PM
Creation date
5/12/2020 12:36:06 PM
Metadata
Fields
Template:
Meeting
Date
6/18/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
54424
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 6, 2019 <br />Jacobs Engineering <br />JE <br />BIG BOULDER CREEK BRIDGE <br />REPLACEMENT <br />Env. Group <br />Lead <br />Env. <br />Project <br />Manager <br />Permit <br />Lead <br />Sr. <br />Cultural <br />Guttural <br />Field <br />Tech <br />Env. <br />Engineer <br />Jr <br />Biologist <br />Technical <br />Editor <br />Admin <br />Nem <br />SCOPE OF WORK <br />$162.07 <br />$117.18 <br />$82.61 <br />$186.521 <br />$68.60 <br />$82.39 <br />1 $62.81 <br />$111.60 <br />$61.25 <br />1 <br />PROJECT MANAGEMENT <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />0 <br />o <br />a <br />o <br />a <br />o <br />$o <br />aig man <br />2 <br />STRUCTURAL ENGINEERING <br />Labor Subtotal: <br />GEOTECHNICAL ENGINEERING <br />o <br />0 <br />0 <br />_ 0_ <br />0 <br />0 <br />0 <br />0 <br />0 <br />$0 <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />$0 <br />4 <br />HYDRAULIC ENGINEERING <br />Labor Subtotal: <br />a <br />o <br />o <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />$0 <br />5 <br />ENVIRONMENTAL DOCUMENTATION & <br />PERMITTING <br />5.10 <br />Project Management <br />2 <br />14 <br />4 <br />$2,210 <br />5.20 <br />Agency Coordination <br />3 <br />5 <br />$1,072 <br />5.30 <br />NEPAISEPA Documentation <br />1 <br />5 <br />30 <br />$3,232 <br />5.40 <br />Biological Assessment <br />40 <br />20 <br />96 <br />5 <br />$17.334 <br />5.50 <br />NHPA Section 106 Evaluation <br />1 <br />4 <br />2 <br />50 <br />2 <br />$4.657 <br />5.60 <br />JARPA Package Preparation and Submittal <br />1 <br />5 <br />40 <br />10 <br />5 <br />2 <br />$5.522 <br />5.70 <br />Local Permits and Approvals <br />1 <br />3 <br />16 <br />$1.839 <br />5.80 <br />Biology Support During Construction (Optional) <br />z <br />40 <br />$3547 <br />5.90 <br />Permit Update - 60' Br dge <br />5 <br />6 <br />14 <br />2C <br />40 <br />$7,867 <br />Labor Subtotal: <br />54 <br />L 66 <br />100 <br />2 <br />50 <br />30 <br />181 <br />9 <br />4 <br />$47,280 <br />$705 <br />6 <br />CIVIL ENGINEERING <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />0 <br />1 0 <br />0 <br />0 <br />0 <br />0 <br />$0 <br />Labor Sum: <br />54 <br />56 <br />1 100 <br />1 2 <br />50 <br />3U <br />1131 <br />V <br />d <br />$47260 <br />Reimbursable Sum: <br />$705 <br />fPrL^1 <br />I <br />Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.