Laserfiche WebLink
June 6, 2019 <br />Watershed Science & Engineering <br />WSE <br />BIG BOULDER CREEK BRIDGE <br />REPLACEMENT <br />Principal <br />Senior <br />Engineer 1 <br />Junior <br />Engineer <br />Contract <br />Administrate <br />Item I SCOPE OF WORK <br />$212.99 <br />$188.66 <br />$97.37 <br />$94.93 <br />1 PROJECT MANAGEMENT <br />— Labor Subtotal: <br />is <br />urwr mala Ak-D§12�- <br />0 <br />0 <br />— 0 <br />0 <br />$o <br />2 STRUCTURAL ENGINEERING <br />Labor Subtotal: <br />GEOTECHNICAL ENGINEERING <br />0 <br />0 <br />0 <br />0 <br />$0 <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />0 <br />$0 <br />4 HYDRAULIC ENGINEERING <br />4.10 Data Collection and Review <br />2 <br />a <br />$1,205 <br />4.20 Site Inspection <br />8 <br />a <br />$2,483 <br />4.30 Channel Survey <br />2 <br />4 <br />$615 <br />4.40 Hydrology <br />z <br />4 <br />$B15 <br />4.50 Hydraulic Analysis <br />z <br />1 <br />20 <br />$2,562 <br />4.60 Channel Stability and Scour Assessment <br />10 <br />16 <br />$3;686 <br />4.70 WDFW and Permit Coordination <br />12 <br />4 <br />$2.945 <br />4.80 Hydraulic Investigation Report <br />20 <br />4 <br />16 <br />$6.572 <br />4.90 Meetings & Administration <br />10 <br />3 <br />z <br />$2,612 <br />4.100 Feasibility Review for 60' span bridge <br />4 <br />e <br />1 <br />$1,726 <br />4. f0f Review of temporary bridge details for 1 year <br />.in service <br />4 <br />q <br />$1,241 <br />Optio <br />nal <br />Labor Subtotal: <br />76 <br />5 <br />95 <br />3 <br />$28,665 <br />$218 <br />5 ENVIRONMENTAL DOCUMENTATION & <br />PERMITTING <br />Labor Subtotal: <br />6 CIVIL ENGINEERING <br />0 <br />0 <br />0 <br />0 <br />$0 <br />Labor Subtotal: <br />l!.abol-Su�r�. <br />um <br />0 <br />#t <br />io <br />0 1 <br />Do <br />0 <br />"a 0 <br />0 <br />'a <br />� <br />$0 <br />Mnn of <br />Reimbursable Sum: <br />$218 <br />1CPff Page 3 of 4 <br />