My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-10-minutes-public-works-study-session
>
Meetings
>
2019
>
06. June
>
2019-06-18 10:00 AM - Commissioners' Agenda
>
2019-06-10-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 12:40:47 PM
Creation date
5/12/2020 12:36:06 PM
Metadata
Fields
Template:
Meeting
Date
6/18/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
54424
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 6, 2019 <br />Hart Cromer, Inc. <br />HC <br />BIG BOULDER CREEK BRIDGE <br />REPLACEMENT <br />Principal <br />Project <br />SeniorSlatr <br />Seniorprafler <br />Project <br />Assistant <br />Nem <br />I SCOPE OF WORK <br />$262.16 <br />$127.10 <br />$113.56 <br />$112.93 <br />$105.60 <br />1 <br />PROJECT MANAGEMENT <br />Labor Subtotal: <br />a <br />D <br />a <br />a <br />o <br />$o <br />2 <br />STRUCTURAL ENGINEERING <br />y� <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />0 <br />D <br />$o <br />GEOTECHNICAL ENGINEERING <br />3.10 <br />Planning and Research <br />2 <br />2 <br />2 <br />_ 51.Aoe <br />3.20 <br />Field Work <br />3.24 <br />Site Reconnaissance and Utility Locates <br />1 <br />8 <br />51,038 <br />3.22 <br />Field Explorations <br />1 <br />1 <br />12 <br />$17512 <br />3.23 <br />Sample Review & Laboratory Testing <br />4 <br />1 <br />_ _$6_22 <br />3.30 <br />Office Work <br />_ <br />3.34 <br />Engineering Analysis and Consultations <br />4 <br />16 <br />a <br />2 <br />$4,217 <br />3.32 <br />Geotechnical Reporting <br />6 <br />12 <br />3 <br />4 <br />4 <br />$4,313 <br />3.33 <br />Project Management and Meetings <br />8 <br />2 <br />$2.308 <br />3.40 <br />3.50 <br />Construction Support <br />Feasibility Review for 60' span bridge <br />2 <br />2 <br />4 <br />1 <br />5x52 <br />$857 <br />3.51 <br />Review of temporary bridge details for 1 year <br />in service <br />2 <br />2 <br />$751 <br />Labor Subtotal: _ <br />jRm-L <br />25 <br />36 <br />38 <br />10 <br />7 <br />$17,313 <br />$8,423 <br />4 <br />HYDRAULIC ENGINEERING <br />Labor Subtotal: <br />0 <br />0 <br />0 <br />0 <br />0 <br />$o <br />5 <br />ENVIRONMENTAL DOCUMENTATION & <br />PERMITTING <br />Labor Subtotal: <br />0 <br />0 <br />o <br />a <br />0 <br />$0 <br />6 <br />CEWL ENGINEERING <br />Labor Subtotal. <br />6--7 <br />0 <br />0 <br />I 0 <br />0 <br />$a <br />jaborSvm:l <br />Ralmbutable Stien; <br />26 <br />36 <br />36 <br />10 <br />7 <br />$17,313 <br />$8,423 <br />1� Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.